Hatch Stagefield Air Traffic Control Tower Equipment Movement
Contact and place of performance
Melissa Mayhall
Fort Rucker, AL 36362
USA
This non personal services requirement is being competed as a Firm Fixed Price 100% Total Small Business set aside, under NAICS 238210 and PSC N059.
The contractor shall provide all personnel and supervision required to perform the de-installation of Air Traffic Control (ATC) equipment in the existing Air Traffic Control Tower (ATCT) at Hatch Stagefield, Fort Rucker, Alabama and the installation of the ATC equipment into newly constructed ATCT as per building design. Installation shall include all required cabling and grounding as specified in the appropriate regulations and standards FAA-STD-019e and MIL-STD-188-124(B).
The Department of the Army, Mission Installation Contracting Command at Fort Rucker, is soliciting for the de-installation and subsequent installation of Air Traffic Control equipment at Hatch Stagefield in Alabama. This requirement involves moving equipment from the existing Air Traffic Control Tower into a newly constructed tower according to specific building designs. The contractor is responsible for providing all personnel and supervision to perform the work, which includes all necessary cabling and grounding in compliance with FAA-STD-019e and MIL-STD-188-124(B) standards.
This requirement is a combined synopsis and solicitation identified as W9124G-26-R-A007 and is being competed as a firm-fixed-price project. The solicitation is a 100% total small business set-aside under the acronym and explanation SBA; SBA. The primary classifications for this work are NAICS 238210 Electrical Contractors and Other Wiring Installation Contractors and PSC N059 INSTALLATION OF EQUIPMENT- ELECTRICAL AND ELECTRONIC EQUIPMENT COMPONENTS.
Work will be performed at Fort Rucker, Alabama, with a response deadline of June 30, 2026. The solicitation package, published on May 26, 2026, includes eight attachments such as a statement of work, pricing schedule, evaluation criteria, and instructions to offerors. Melissa Mayhall serves as the point of contact for this requirement.