SD FTFW MADI 10(2) & 9000(1) REHAB MADISON WMD HQ ROAD
Contact and place of performance
Douglas Whitcomb
SD 57042
USA
PROJECT NUMBER: SD FTFW MADI 10(2) & 9000(1) PROJECT NAME: REHAB MADISON WMD HQ ROAD PROJECT DESCRIPTION : The scope of this project includes pavement reconstruction to the approach road and parking lot for the Madison Wetland Management District (WMD) Headquarters and the United States Fish and Wildlife Service (USFWS) Visitor Center. The designed pavement section is proposed to be 3.5 inches...
View moreThe project also includes full reconstruction of the existing parking lot and the asphalt apron on its east side, which connects to the concrete trail leading to the visitor center’s east entrance. The updated pavement marking layout will provide eight 10-foot by 20-foot parking stalls with one accessible stall on the north side, and ten 10-foot by 20-foot stalls on the south side. The northern edge of the parking area will maintain its existing tie-in elevation with the 6-foot sidewalk, and the parking surface will be regraded to a uniform 1.75% cross slope, removing the existing centerline grade break.
The Federal Highway Administration has issued solicitation 6982AF26B000008 for the rehabilitation of the Madison Wetland Management District Headquarters road and parking lot in South Dakota. This project involves pavement reconstruction for the approach road and parking lot serving both the headquarters and the United States Fish and Wildlife Service Visitor Center. The scope includes installing a pavement section comprised of 3.5 inches of asphalt concrete pavement over 4 inches of aggregate base material, designed to improve safety, mobility, and service life for staff and visitors.
Construction activities will preserve the existing two-way, single-lane operation by maintaining a consistent 14-foot roadway section. Work also encompasses reconstructing the approach road apron, the existing parking lot, and an asphalt apron connecting to a concrete trail. The reconstructed parking area will feature a regraded 1.75% cross slope and updated pavement markings for eighteen parking stalls, including one accessible stall. The northern edge of the parking area will maintain its existing tie-in elevation with the adjacent 6-foot sidewalk.
This requirement is classified under NAICS 237310 for Highway, Street, and Bridge Construction and PSC Y1LB for Construction of Highways, Roads, Streets, Bridges, and Railways. There is no set-aside designated for this procurement. Responses are due by June 16, 2026. The solicitation includes seven attachments, such as pavement reports, design files, and multiple amendments, with Douglas Whitcomb serving as the primary point of contact.