Name | Type | Posted | Actions |
|---|---|---|---|
https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=W90VN725RA028¬iceType=CombinedSynopsisSolicitation | LINK | Jun 11, 2025 | |
https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf | LINK | Jun 11, 2025 | |
https://dodprocurementtoolbox.com/ | LINK | Jun 11, 2025 | |
https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml | LINK | Jun 11, 2025 |
(WP MATOC) Renovate Dormitory, Bldg._342, Kunsan AB
Contact and place of performance
KYONG KO
96264
MATOC Work Plan Task Order for MLWR15-1006 RENOVATE DORMITORY, BLDG 342, KUNSAN AFB. - K work- THIS IS RFP FOR THE FOLLOWING 411TH CSB MATOC -AREA IV- WORK-PLAN CONTRACTORS ONLY.W91QVN-24-D-0039, -0041, -0042, -0043, -0044, -0045, -0046, -0047, -0049, -0050, 0053, 0055, -0056, - 0058, -0081 AND -0110.- Instructions: IAW 411th CSB General Construction MATOC Terms and Conditions- For more detailed statement of work associated with this solicitation, SEE Section J, Statement of Work 15-1006.pdf. Technical documentation, data, and design package for the proposal evaluation is cited in the para graph 1A-8 in the - Statement of Work 15-1006.pdf-
The Department of the Army, through the 630th Support Detachment, issued solicitation W90VN725RA028 as a combined synopsis and solicitation for the renovation of Dormitory Building 342 at Kunsan Air Base. This requirement is a Multiple Award Task Order Contract (MATOC) work plan task order identified as MLWR15-1006. The project falls under NAICS 236220, Commercial and Institutional Building Construction, and PSC Z1FZ, Maintenance of Other Residential Buildings.
Participation is restricted to specific 411th CSB MATOC Area IV Work-Plan contractors, including contract holders W91QVN-24-D-0039, -0041, -0042, -0043, -0044, -0045, -0046, -0047, -0049, -0050, -0053, -0055, -0056, -0058, -0081, and -0110. Proposals must be prepared in accordance with the 411th CSB General Construction MATOC terms and conditions and must utilize the technical documentation and design packages cited in the project statement of work. Responses are due by July 11, 2025, and Kyong Ko is the point of contact for this requirement.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.