No attachments available.
Gaseous Hydrogen Robins AFB, GA, Arnold AFB, TN and Tinker AFB, OK
Contact and place of performance
Carrie Harmon
San Antonio, TX 78226
USA
INTRODUCTION: This pre-solicitation notice issued by the Defense Logistics Agency (DLA) Energy-FEM- San Antonio, Texas. This is NOT a solicitation for proposal. No awards will be made from the responses to this announcement. The Defense Logistics Agency Energy (DLA Energy), as the Department of Defense (DOD) Integrated Material Manager (IMM) for Aerospace Energy products and related services has a 60-month requiremen...
View moreThe Defense Logistics Agency Energy-FEM, located in San Antonio, Texas, issued this pre-solicitation notice for a 60-month requirement to supply bulk Gaseous Hydrogen (GH2). The procurement supports Department of Defense requirements for product conforming to Grade B, Type 1, specification BB-H-886F; Propellant Hydrogen conforming to Type 1, MIL-PRF-27201 F; and Gaseous Hydrogen, GAS, TECHNICAL, 99.999% BULK, CGA G-5.3. The anticipated contract is a Firm-Fixed Price Requirements Contract with a performance period running from April 1, 2024, through March 31, 2029.
The scope involves an estimated total quantity of 17,575,000 cubic feet of product delivered F.O.B. Destination to three primary locations: Warner Robins Air Force Base, Georgia (1,750,000 CF); Arnold Air Force Base, Tennessee (825,000 CF); and Tinker Air Force Base, Oklahoma (15,000,000 CF). In addition to the product, the contractor must provide all materials, management, tools, equipment, transportation, and labor necessary for associated services, including equipment installation, tank and equipment usage, emergency deliveries, detention fees, and container evacuation or purging.
This opportunity is identified under solicitation number SPE60123R0314 and is classified under NAICS code 325120 for Industrial Gas Manufacturing and PSC 9135 for Liquid Propellant Fuels and Oxidizers, Chemical Base. While the government intends to use commercial item procedures under FAR Part 12, the statutory authority cited is 41 U.S.C. 3304(a)(1), which allows for other than full and open competition when only one supplier can satisfy agency needs. Responses to this notice are due by July 25, 2023, with the formal solicitation expected for release on or about August 2023.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.