Name | Type | Posted | Actions |
|---|---|---|---|
MACC_Section_L_0003.pdf | May 1, 2019 | ||
Solicitation_Amendment_FA481419RA0010003_SF_30.pdf | May 1, 2019 | ||
Q&A_Clarification.pdf | May 1, 2019 | ||
MACC_Section_M_0003.pdf | May 1, 2019 | ||
QA2_-_MASTER.pdf | Apr 15, 2019 | ||
Solicitation_Amendment_FA481419RA0010002_SF_30.pdf | Apr 15, 2019 | ||
APPENDICES_1_-_17_FA481419RA001.zip | ZIP | Apr 2, 2019 | |
Solicitation_Amendment_1.pdf | Apr 2, 2019 | ||
MACC_Section_L.pdf | Apr 2, 2019 | ||
Q&A.pdf | Apr 2, 2019 | ||
RFP_Attachment_1_SOW.pdf | Apr 2, 2019 | ||
Site_Visit_Briefing_Slides_V2.ppt | PPT | Mar 21, 2019 | |
Sign_in_sheet.pdf | Mar 21, 2019 | ||
16-0123(Seed).zip | ZIP | Mar 20, 2019 | |
SEED_SOW_App_K_Design_Req.pdf | Mar 11, 2019 | ||
RFP_Attachment_7_NAF_Construction_Clauses.docx | DOCX | Mar 11, 2019 | |
Attachment_3_Performance_Reference.docx | DOCX | Mar 11, 2019 | |
RFP_Attachment_6_Background_Check.xlsx | XLSX | Mar 11, 2019 | |
Attachment_5_Wage_Determinations.pdf | Mar 11, 2019 | ||
Attachment_4_Performance_Survey.doc | DOC | Mar 11, 2019 | |
MAP.jpg | JPG | Mar 7, 2019 | |
RFP_Attachment_1_SOW.pdf | Mar 6, 2019 | ||
SEED_SOW_App_A_16-0123_Drawings.pdf | Mar 6, 2019 | ||
ppi_tool.accdb | ACCDB | Mar 6, 2019 | |
SEED_SOW_App_E_Haz_Matls_Fm_Instruc.pdf | Mar 6, 2019 | ||
SOW_Appendix_2_MacDill_AFB_Traffic_Control_Standards.pdf | Mar 6, 2019 | ||
SEED_SOW_App_F_16-0123_Min_Perf_Stan.pdf | Mar 6, 2019 | ||
SOW_Appendix_5_SOP_4_Investigation_Derived_Waste.pdf | Mar 6, 2019 | ||
Interior_Design_Guide_(AMC.pdf | Mar 6, 2019 | ||
SOW_Appendix_6_SOP_6_Well_Install_Abn.pdf | Mar 6, 2019 | ||
SOW_Appendix_7_List_of_ERP_Sites.pdf | Mar 6, 2019 | ||
SOW_Appendix_8_Antiterrorism_Level_I_Training_Aid.pdf | Mar 6, 2019 | ||
SOW_Appendix_9_Contractor_Security.pdf | Mar 6, 2019 | ||
SEED_SOW_16-0123.pdf | Mar 6, 2019 | ||
SEED_SOW_App_B_16-0123_BLANK_3052.xlsx | XLSX | Mar 6, 2019 | |
SEED_SOW_App_C_16-0123_AF66.xls | XLS | Mar 6, 2019 | |
Solicitation_-_FA481419RA001_(2).pdf | Mar 6, 2019 | ||
2018_MacDill_Design_Guide.pdf | Mar 6, 2019 | ||
MACC_Section_M_V3.pdf | Mar 6, 2019 | ||
MACC_Section_L_V3.pdf | Mar 6, 2019 | ||
SEED_SOW_App_D_16-0123_FGUA_Fee_Inspection_Memo.pdf | Mar 6, 2019 | ||
SEED_SOW_App_D_16-0123_FGUA_Fee_Inspection_Memo.pdf | Mar 6, 2019 | ||
SOW_Appendix_3_Landscape_and_Design_Procedures.pdf | Mar 6, 2019 | ||
SEED_SOW_App_G_MAFB_Grn_Procur_Determ_Fm.pdf | Mar 6, 2019 | ||
SEED_SOW_App_H_16-0123_CD_Disp_Form.pdf | Mar 6, 2019 | ||
SEED_SOW_App_I_16-0123_Asbestos_Notif_FM.pdf | Mar 6, 2019 | ||
SEED_SOW_App_A_16-0123_Drawings.pdf | Mar 6, 2019 | ||
SEED_SOW_App_J_As_Builts.pdf | Mar 6, 2019 | ||
SEED_SOW_App_I_16-0123_Asbestos_Notif_FM.pdf | Mar 6, 2019 | ||
SEED_SOW_App_H_16-0123_CD_Disp_Form.pdf | Mar 6, 2019 | ||
SEED_SOW_App_G_MAFB_Grn_Procur_Determ_Fm.pdf | Mar 6, 2019 | ||
SEED_SOW_App_F_16-0123_Min_Perf_Stan.pdf | Mar 6, 2019 | ||
SEED_SOW_App_E_Haz_Matls_Fm_Instruc.pdf | Mar 6, 2019 | ||
SEED_SOW_App_A_16-0123_Drawings.pdf | Feb 4, 2019 | ||
SEED_SOW_App_A_16-0123_Drawings.pdf | Feb 4, 2019 | ||
Solicitation_-_FA481419RA001.pdf | Feb 4, 2019 | ||
RFP_Attachment_1_SOW.pdf | Feb 4, 2019 | ||
SEED_SOW_App_F_16-0123_Min_Perf_Stan.pdf | Feb 4, 2019 | ||
SEED_SOW_16-0123.pdf | Feb 4, 2019 | ||
SEED_SOW_App_A_16-0123_Drawings.pdf | Feb 4, 2019 | ||
MACC_Section_M_V3.pdf | Feb 4, 2019 | ||
MACC_Section_L_V3.pdf | Feb 4, 2019 |
Multiple Award Construction Contract
Contact and place of performance
Patrick Boyette
MacDill AFB, FL 33621
USA
The purpose of this amendment is to incorporate clarifications to Q&A received from industry and to remove certain page limitations from the seed project technical factor submission and remove the requirement for cut sheets. Please see Amendment 3 and the attached updated sections L & M as well as the Clarification for more information.
The Department of the Air Force, specifically the FA4814 6 CONS PK, is soliciting proposals for a Multiple Award Construction Contract (MACC) to be performed at MacDill Air Force Base in Florida. This procurement is classified under NAICS code 236220 for Commercial and Institutional Building Construction and PSC code Z. This opportunity is designated as an SBA set-aside. Interested parties must submit their responses by the deadline of May 7, 2019.
The scope of this solicitation involves providing construction services through a multi-award vehicle. Recent amendments to the solicitation, including Amendment 3 and updated Sections L and M, have incorporated clarifications based on industry questions and answers. These updates removed specific page limitations for the seed project technical factor submission and eliminated the requirement for cut sheets.
Administrative oversight for this solicitation is managed by Patrick Boyette. The notice includes 62 attachments, such as solicitation amendments, master question and answer documents, and technical clarification files. All work associated with this contract will take place within the United States at MacDill AFB.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.