Earthen Material Supply Blanket Purchase Agreement, Naugatuck River Basin, CT
Contact and place of performance
Alicia LaCrosse
Thomaston, CT
USA
The U.S. Army Corps of Engineers - New England District is issuing a Solicitation Notice for a Blanket Purchase Agreement (BPA) to provide an indefinite quantity of Earthen Material Supply to the following nine (9) locations in Connecticut: Black Rock Lake, Thomaston Dam, and Northfield Brook Lake in Thomaston, CT Colebrook River Lake in Colebrook, CT Goshen Radio Relay Station in Goshen, CT Hancock Brook Lake in Ter...
View moreALL VENDORS MUST HAVE AN ACTIVE REGISTRATION IN SAM.GOV AT THE TIME OF SUBMISSION IN ORDER TO BE CONSIDERED. ANY VENDOR THAT DOES NOT HAVE AN ACTIVE SAM.GOV REGISTRATION WILL BE REJECTED AS NON RESPONSIVE.
The U.S. Army Corps of Engineers, New England District, has issued solicitation W912WJ26QA065 for a Blanket Purchase Agreement (BPA) to supply earthen materials to the Naugatuck River Basin. The contractor must provide all labor, equipment, materials, and transportation necessary to deliver supplies to nine specific locations across Connecticut, including Black Rock Lake, Thomaston Dam, Northfield Brook Lake, Colebrook River Lake, Goshen Radio Relay Station, Hancock Brook Lake, Hop Brook Lake, the Naugatuck River Basin Office, and the Stamford Hurricane Barrier. The resulting agreement will have a 36-month performance period from the date of award, with a master limit of $250,000 and a maximum individual call limit of $25,000.
This solicitation is a Small Business Administration (SBA) set-aside under NAICS code 327991 for Cut Stone and Stone Product Manufacturing and PSC 5680 for Miscellaneous Construction Materials. Vendors are required to have an active registration in SAM.gov at the time of submission to be considered responsive. Alicia LaCrosse is the designated point of contact for this requirement.
Responses are due by March 27, 2026. The primary place of performance is Thomaston, CT, 06787. The solicitation includes five attachments: the original solicitation, an RFP BPA document, a solicitation survey, and two subsequent amendments. All necessary details regarding the indefinite quantity supply requirements are outlined in these documents published between March 17 and March 24, 2026.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.