Attachment 16_ DBA WD IL2026008 Mod 1_1.9.26.pdf | Jun 2, 2026 | ||
Attachment 15 _ Payment BondFL-42.pdf | Jun 2, 2026 | ||
Attachment 14_Bid Bond FL-41.pdf | Jun 2, 2026 | ||
Attachment 13_PUR-466_Proposal Certifications_r5_10.14.25.pdf | Jun 2, 2026 | ||
Attachment 12_SARC_Subcontractor Annual RepsCerts Rev 8.pdf | Jun 2, 2026 | ||
Attachment 11_ Price Proposal Form.pdf | Jun 2, 2026 | ||
Attachment 10_Fermilab Subcontractor Safety Information Questionnaire.pdf | Jun 2, 2026 | ||
Attachment 9_SF1413-23a (1).pdf | Jun 2, 2026 | ||
Attachment 8_2025 Construction Insurance Requirements.pdf | Jun 2, 2026 | ||
Attachment 7_FFDG General Terms and Conditions for Construction (08.2025).pdf | Jun 2, 2026 | ||
Attachment 6_014100_Quality_Requirements_-_1_QC_Plan_Not_Required.pdf | Jun 2, 2026 | ||
Attachment 5_013300_Submittals_FermiForward_5.pdf | Jun 2, 2026 | ||
Attachment 4_013100_ESH_Requirements_04-2025_FFDG_1.pdf | Jun 2, 2026 | ||
Attachment 3_010010_General_Requirements_3_2025_FFDG_12.pdf | Jun 2, 2026 | ||
Attachment 2_Notes_for_project_of_replacing_FFDG-Supplied_Process_Chiller_MI-31.pdf | Jun 2, 2026 | ||
Attachment 1_SOW_Replace FFDG-Supplied Process Chiller.pdf | Jun 2, 2026 | ||
1.0 RFP Instructions to Offerors_380607_DG.pdf | Jun 2, 2026 |
Fermilab-Replace FFDG-Supplied Process Chiller-380607-DG
The Department of Energy, through its contractor Fermi Forward Discovery Group (FFDG), is soliciting proposals for the replacement of a process chiller at the Fermi National Accelerator Laboratory (Fermilab) in Batavia, Illinois. This construction project requires the subcontractor to provide all labor, materials, transportation, and supervision necessary to decommission existing equipment and install a new AEC GPL07A Packaged Chiller. The scope includes demolition of indoor and outdoor units, mechanical and electrical installations, and integration with existing control systems. The solicitation is a firm-fixed-price procurement with a response deadline of July 1, 2026. Offerors must comply with technical and administrative requirements, including Davis-Bacon Act wage determinations and safety standards. The project is divided into specific performance milestones, ranging from initial submittals and site mobilization to final project closeout and the delivery of as-built drawings. The attachment package comprises 16 documents that define the technical specifications, legal terms, and mandatory submission forms. These include a Statement of Work, General Requirements, Environment, Safety, and Health (ES&H) protocols, and various bond templates. Failure to provide required items such as the Corporate Quality Assurance Plan or the Bid Bond will result in a non-responsive determination. Fermi Forward Discovery Group (FFDG) is seeking a subcontractor to replace a process chiller at Fermilab in Batavia, Illinois. The work includes demolishing existing units and installing a new AEC GPL07A Packaged Chiller, along with electrical, mechanical, and control system updates. The subcontractor will provide all labor, materials, and supervision as specified in the Statement of Work…
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.
Contact and place of performance
Dasia Guthrie
Batavia, IL 60510
USA
The Subcontractor shall perform all work as described in the Statement of Work titled for the Replace FFDG-Supplied Process Chiller and Attachment 2- Notes for Project “Replace FFDG-Supplied Process Chiller” All work shall include transportation, overhead, bonding costs, insurance, safety oversight, quality control oversight, and supervision as required to construct the project described in the scope of work, and the detailed description contained herein.