Name | Type | Posted | Actions |
|---|---|---|---|
Abstract of Offers - Construction - W911XK25BA024 - W Dickinson Island Offloading Platform (Final).pdf | Jul 30, 2025 | ||
https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf | LINK | Jun 4, 2025 | |
https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml | LINK | Jun 4, 2025 | |
https://dodprocurementtoolbox.com/ | LINK | Jun 4, 2025 | |
https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=W911XK25BA024¬iceType=SolicitationNotice | LINK | Jun 4, 2025 |
West Dickinson Offloading Platform
Contact and place of performance
Noah Bruck
Not specified
***Posting of the bid abstract. ***Amendment 0003 is issued to update Wage Determination MI20250072 and provide revised Plan Sheets S-301, S-302 and S-502. Reference the following pages for further details.***Amendment 0002 is issued to update Wage Determination MI20250072, provide revised Plan Sheets CN101, V-100, S-101, S-301, S-302, S-501 and S-502 and revised Specification Sections 05 12 00, 05 50 14 and 35 59 13...
View moreThe U.S. Army Corps of Engineers, Detroit District, issued this invitation for bid for the construction of a new steel sheet pile offloading platform at West Dickinson Island. This project, categorized under NAICS 237990 (Other Heavy and Civil Engineering Construction) and PSC Z2KF (Repair or Alteration of Dredging Facilities), is a 100% small business set-aside (SBA). The new structure is designed to provide access to the West Dickinson Island Confined Disposal Facility (CDF) by tying into the existing elevation and alignment of the CDF dike.
The offloading platform will serve as a transfer site for marine operations to offload heavy equipment, including dozers, excavators, off-road trucks, material handlers, cranes, and 18-inch HDPE pipe. Additionally, the site will function as a transfer point for dredged material and a staging area for CDF maintenance activities. The solicitation process included three amendments that updated wage determinations, revised plan sheets and specification sections, provided site visit attendee lists, and extended the original deadlines.
Solicitation W911XK25BA024 concluded with a response deadline of July 29, 2025. Following the bid opening, the agency published a bid abstract on July 30, 2025, detailing the offers received for the construction project. The administrative record for this solicitation includes one attachment, the Abstract of Offers, and lists Noah Bruck as the primary point of contact for the Detroit office.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.