NRCS-WV Ohio County EWP 5090-001 & 003 Streambank Stabilization Dixon and McGraw's Run
The USDA Natural Resources Conservation Service in West Virginia is soliciting bids for streambank stabilization in Ohio County. This Emergency Watershed Protection (EWP) project, 5090-001 & 003, involves infrastructure work at Dixon and McGraw's Run to control erosion. The procurement is a 100% small business set-aside. The contractor will provide labor, equipment, and materials for channel restoration, including clearing, shaping, and installing erosion control measures. Technical tasks include soil amendments, seeding, mulching, and constructing earth embankments. The scope also covers mobilization, water removal, and traffic control during the 36-day performance period. Engineering drawings, material specifications, and Davis-Bacon wage determinations are provided. Bids require a 20% guarantee and are due June 18, 2026. The scope includes clearing debris, shaping channels, and installing gabion walls and rock riprap. Contractors are responsible for site management, traffic control, water diversion, and final site treatment such as seeding and mulching. Operations include mobilization, traffic control, and water management. Access roads and fences must be restored to original condition. This is a 100% small business set-aside.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.
Contact and place of performance
Mark Domingo
WV
USA
Please see Attachment 1 Specifications documents for full details of services requried. USDA-NRCS West Virginia - Ohio County EWP 5090-001 & 003 Streambank Stabilization Dixon and McGraw's Run A site visit will be held on date May 28th, 2026 at 10:00am ET on that day. Attendees will meet at: Valley Grove Community Center 8566 National Road Valley Grove, WV 26060 The project consists of clearing designat...
View moreEstablishing traffic control and maintaining safe, convenient use of public roads and right of way.
Removal of surface water and ground water as necessary to perform the construction required by the contract in accordance with the specifications. It must include: (1) constructing, installing, building, and maintaining all necessary temporary water containment facilities, channels, and diversions; (2) furnishing, installing, and operating all necessary pumps, piping, and other facilities and equipment; and (3) removing all such temporary works and equipment after their intended function is no longer required.
Excavation required by the drawings and specifications, as well as the disposal of the excavated materials.
Construction of earth embankments, other earthfills, and earth backfills required by the drawings and specifications.
*See Specifications document attached to posting for full details of required work.