Name | Type | Posted | Actions |
|---|---|---|---|
B01. Bid Abstract signed.pdf | Dec 20, 2023 | ||
A21 Amended Solicitation 0004 12 DEC 2023.pdf | Dec 13, 2023 | ||
A21. Amended Solicitation 0003 28 NOV 2023.pdf | Dec 5, 2023 | ||
Amended Solicitation 0002 20 NOV 2023.pdf | Nov 20, 2023 | ||
Site Visit Agenda.pdf | Nov 16, 2023 | ||
Site Visit Sign In Sheet.pdf | Nov 16, 2023 | ||
Amended Solicitation 0001 17 NOV 2023.pdf | Nov 7, 2023 | ||
A21. Solicitation Revised 13 OCT 2023.pdf | Oct 13, 2023 | ||
Attachment 2 - FAC Appendices.pdf | Oct 13, 2023 | ||
Attachment 1 - FAC Spec 12OCT2023.pdf | Oct 13, 2023 | ||
A21. Solicitation Signed.pdf | Oct 11, 2023 | ||
Lake Shelbyville | LINK | Oct 11, 2023 | |
Attachment 1 - 2023 Shelby FAC Specs 5SEP2023.pdf | Oct 11, 2023 | ||
Attachment 2 2023 Shelby FAC Appendices.pdf | Oct 11, 2023 | ||
Attachment 3 -03 30 00.99_Cast Conc.pdf | Oct 11, 2023 | ||
Attachment 4 - (12) Done_W_32 40 00 v.2Misc Equip_Labor_Materials.pdf | Oct 11, 2023 |
USACE W912P9 St. Louis District Lake Shelbyville Facilities Infrastructure Construction & Maintenance IDIQ Solicitation
Contact and place of performance
Marla Sawyer
Shelbyville, IL 62565
USA
All bidders must acknowledge amendments by amendment numbers, date issued and initials. See Block 19, SF 1442. 12 DEC 2023, Amendment 0004, Update language from Bid Guarantee to Letter of Surety in Instructions to Bidders (See Red Font) 2. Insert Questions and Answers to the 2nd Submission of Inquiry. 28 NOV 2023, Amendment 0003 Issued (Updated with SF30 Change Only Version), Removal of FAR 52.228-1 Bid Guarantee, Ad...
View moreThe Department of the Army, U.S. Army Corps of Engineers (USACE) St. Louis District, issued solicitation W912P923B0009 for the Lake Shelbyville Facilities Infrastructure Construction and Maintenance Indefinite Delivery Indefinite Quantity (IDIQ) contract. This requirement falls under NAICS code 237990, Other Heavy and Civil Engineering Construction, and PSC Z1PA, Maintenance of Recreation Facilities (Non-Building). The procurement was designated as a Small Business Administration (SBA) set-aside. Work is performed in Shelbyville, Illinois, with an estimated project magnitude between $5,000,000 and $10,000,000.
The contract scope involves infrastructure construction and maintenance services at Lake Shelbyville facilities. Following several amendments, the government updated the instructions to bidders to replace bid guarantee requirements with letters of surety and individual surety pledges of assets. The solicitation process included a site visit and multiple rounds of technical inquiries. The final response deadline for this solicitation was December 19, 2023.
Notice metadata includes 16 attachments such as the original and amended solicitation documents, site visit agendas and sign-in sheets, and a signed bid abstract. Marla Sawyer served as the point of contact for this requirement. Bidders were required to acknowledge all amendments, including those providing answers to submissions for inquiry and updated WebEx information for the bid opening.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.