Name | Type | Posted | Actions |
|---|---|---|---|
https://dodprocurementtoolbox.com/ | LINK | Sep 25, 2025 | |
https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf | LINK | Sep 25, 2025 | |
https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=W912PL25RA023¬iceType=AwardNotice | LINK | Sep 25, 2025 | |
https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml | LINK | Sep 25, 2025 |
Nellis AFB Building 262 Hangar Addition / Alteration -? 100% Small Business Set-Aside
Contact and place of performance
Nardos Taeme
Not specified
Solicitation Notice: This is a One-Phase Design Build construction contract to repair an existing 1950s hangar at Nellis AFB for a new F-35 Air Maintenance Squadron. The work includes repairs to the hangar bay, administrative space modifications, structural upgrades, and a 4,062 GSF addition for support offices and related spaces. The solicitation will be prepared in accordance with FAR 15, and include evaluation fac...
View moreThe Department of the Army, specifically the U.S. Army Corps of Engineers Los Angeles District (W075 ENDIST LOS ANGELES), issued award notice W912PL25RA023 for a one-phase design-build construction project at Nellis Air Force Base. This requirement involves repairing a 1950s hangar to support a new F-35 Air Maintenance Squadron, including hangar bay repairs, administrative space modifications, and structural upgrades. The project also entails a 4,062-square-foot addition for support offices and related facilities. The contract was competed as a 100% Small Business Set-Aside (SBA) under NAICS 236220 for Commercial and Institutional Building Construction and PSC Z2BZ for Repair or Alteration of Other Airfield Structures.
The acquisition was conducted as a competitive Request for Proposal (RFP) using Best Value Trade-Off procedures, resulting in a firm-fixed-price contract. The estimated magnitude for this construction project is between $25,000,000 and $100,000,000. Performance is scheduled to take place over a period of 720 calendar days following the receipt of the Notice to Proceed. Per the limitations on subcontracting, the small business prime contractor may not pay more than 85 percent of the amount paid by the Government to subcontractors that are not similarly situated entities, excluding the cost of materials.
The notice was published and last updated on September 25, 2025, with Nardos Taeme serving as the primary point of contact. While the solicitation and evaluation were managed through the Procurement Integrated Enterprise Environment (PIEE) and SAM.gov, the metadata indicates no physical attachments are associated with this specific award entry. All offerors were required to maintain an active registration in the System for Award Management (SAM) database to be eligible for consideration.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.