No attachments available.
Design-Build and Construction Services MATOC to support Industrial Base Modernization at Government Owned - Contractor Operated (GOCO) Facilities
Contact and place of performance
SFC Pramod Khanal
USA
The Army Contracting Command – Rock Island (ACC-RI) on behalf of Project Lead Joint Services (PL JS) intends to issue a Request for Proposal (RFP) to establish a Multiple Award Task Order Contract (MATOC) to provide comprehensive Design, Build, and Commissioning support for modernization efforts at the Department of War (DOW) Government-Owned, Contractor-Operated (GOCO) Army Ammunition Plants (AAPs) identified...
View moreContract Vehicle: The Government will award a MATOC Indefinite Delivery/Indefinite Quantity (IDIQ) contract.
Period of Performance: The MATOC ordering period will be five (5) years from the date of award.
Competition Strategy: This will be a Full and Open Competition.
Anticipated RFP Release: The Government anticipates the formal RFP will be released in April 2026.
Place of Performance: Work at the TO level under the MATOC will be performed at the following GOCO AAPs:
Holston AAP (HSAAP), Kingsport, TN
Iowa AAP (IAAAP), Middletown, IA
Lake City AAP (LCAAP), Independence, MO
Milan AAP (MLAAP), Milan, TN
Scranton AAP (SCAAP), Scranton, PA
Radford AAP (RFAAP), Radford, VA
Quad City Cartridge Case Facility (QCCCF), Rock Island, IL
Evaluation Approach
The Government intends to award a MATOC to all responsible offerors whose proposals are determined to meet or exceed the Minimum Technical Threshold Rating (MTTR). The source selection will be conducted in accordance with Revolutionary FAR Overhaul 15.2, using a Highest Technically Rated Offeror (HTRO) self-scoring methodology. Price will not be an evaluation factor for the MATOC award but will be evaluated at the individual TO level.
Disclaimer
This pre-solicitation synopsis is for informational purposes only and is not a request for proposal (RFP). The Government is not seeking proposals at this time. The official RFP, containing all information needed to submit a proposal, will be published on Procurement Integrated Enterprise Environment. Interested parties are responsible for monitoring SAM.gov for the solicitation and any related documents or amendments.
The Army Contracting Command – Rock Island, on behalf of Project Lead Joint Services, intends to establish a Multiple Award Task Order Contract (MATOC) to support industrial base modernization at various Government-Owned, Contractor-Operated Army Ammunition Plants. This Indefinite Delivery/Indefinite Quantity contract, identified under solicitation number W519TC_25_R0026, involves comprehensive design, construction, and commissioning services for projects including energetic material manufacturing lines, load, assembly, and pack lines, and shell casing production facilities. The requirement is classified under NAICS 236210, Industrial Building Construction, and PSC Y1EA, CONSTRUCTION OF AMMUNITION FACILITIES.
The scope utilizes design-build, design-bid-build, and progressive design-build methods to provide building upgrades, energy projects, and environmental improvements. Successful offerors will provide all personnel, equipment, and architectural-engineering services necessary to ensure production readiness through full facility commissioning. Work will be performed over a five-year ordering period at several domestic locations, including the Holston, Iowa, Lake City, Milan, Scranton, and Radford Army Ammunition Plants, as well as the Quad City Cartridge Case Facility.
This procurement is a full and open competition with no set-aside, designated as acronym/code NONE and explanation NONE. The government intends to award contracts to all responsible offerors meeting a Minimum Technical Threshold Rating using a Highest Technically Rated Offeror self-scoring methodology. Price will be evaluated at the individual task order level rather than during the initial MATOC award. The formal request for proposal is anticipated for release in April 2026, and the response deadline for this notice is May 7, 2026. SFC Pramod Khanal is the point of contact for this requirement.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.