Name | Type | Posted | Actions |
|---|---|---|---|
AOCACB26R0033 - 01.pdf | Jun 8, 2026 | ||
Attach 2 - Wage Determination 5.18.26.pdf | Jun 5, 2026 | ||
Attach 10 - Past Performance Questionnaire.pdf | Jun 5, 2026 | ||
Attach 5 - USCP Request for Criminal History.pdf | Jun 5, 2026 | ||
Attach 9 - M - Evaluation Factors for Award.pdf | Jun 5, 2026 | ||
Attach 8 - Section L - Instructions to Offeror.pdf | Jun 5, 2026 | ||
AOCACB26R0033.pdf | Jun 5, 2026 | ||
Attach 3 - AOC Order 37-1 Preservation Policy and Standards 2025.pdf | Jun 5, 2026 | ||
Attach 6 - USCP ID Request.pdf | Jun 5, 2026 | ||
Attach 4 - CUI Order 42-4 Security of Controlled Unclassified Information.pdf | Jun 5, 2026 | ||
Attach 7 - Sample Certificate of Insurance (COI) 2022.pdf | Jun 5, 2026 | ||
Attach 1 - CPP UDS Annual HS Audits 2026-2030 SOW Updated.pdf | Jun 5, 2026 |
Annual Health & Safety Audit
Contact and place of performance
Marcus Sims
Washington, DC
USA
The objective of the Audit is to inform US Capitol Power Plant (CPP) management regarding the current conditions and operational practices within the utility tunnels in terms of safety and health compliance to local, state, and federal regulations. The Audit shall identify and document all current areas of non-compliance. Findings shall address condition changes as related to past reports, new deterioration or safety...
View moreThe Architect of the Capitol, Acquisition & Material Man. Div., is soliciting proposals for an annual health and safety audit under solicitation number AOCACB26R0033. This requirement is classified under NAICS code 541690, Other Scientific and Technical Consulting Services, and PSC code H947, OTHER QC/TEST/INSPECT- PIPE, TUBING, HOSE, AND FITTINGS. There is no set-aside assigned to this procurement, which is represented by the acronym/code NONE. The audit objective is to inform US Capitol Power Plant management of current conditions and operational practices within utility tunnels regarding compliance with local, state, and federal safety and health regulations.
The scope of work includes identifying and documenting all areas of non-compliance, new deterioration, and potential tunnel or pipe failures. The resulting audit report must address changes in conditions relative to past reports, such as accelerated concrete spalling, cracks, pipe insulation damage, and the state of electrical conduits. These assessments must be conducted under the direction of a Certified Industrial Hygienist and/or Safety Specialist, supported by mechanical and electrical engineers, and must include digital photographs of findings.
Performance will take place in Washington, DC, with Marcus Sims serving as the point of contact. The response deadline for this solicitation is July 17, 2026. Documentation associated with this notice includes 12 attachments, such as a wage determination, past performance questionnaire, USCP request for criminal history, instructions to offerors, and evaluation factors for award.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.