Name | Type | Posted | Actions |
|---|---|---|---|
Att 04 - Wage Determination.pdf | Jun 12, 2026 | ||
Att 03 - Boulder Laboratories Physical Access Control Standards.pdf | Jun 12, 2026 | ||
Att 02 - APP A _ NIST Safety Plan Checklist Template.pdf | Jun 12, 2026 | ||
Att 01 - NIST Boulder General Contractor Requirements.pdf | Jun 12, 2026 | ||
1333ND26RNB190030.pdf | Jun 12, 2026 |
NIST Boulder B1 Wing 6 Seal Above Hallway Doors
Contact and place of performance
Lauren Lopez
Boulder, CO 80305
USA
The project consists of extending the Building 1 Wing 6 demising wall vertically to the structural concrete deck above to eliminate a 2–3.5 ft gap and thermally and mechanically isolate Wing 6 from the Spine corridor. Work also includes sealing penetrations and abandoned penetrations with fire‑rated materials where the wall separates the Women’s restroom from the Spine corridor. An optional scope may incl...
View moreThe National Institute of Standards and Technology (NIST) has issued a combined synopsis/solicitation, numbered 1333ND26RNB190030, for construction services at its Boulder, Colorado, campus. This project involves extending the Building 1 Wing 6 demising wall vertically to the structural concrete deck to eliminate an existing 2–3.5 foot gap, effectively isolating Wing 6 from the Spine corridor both thermally and mechanically. The scope includes sealing penetrations and abandoned openings with fire-rated materials where walls separate the women’s restroom from the corridor. An optional scope of work may include the reconstruction of storage room #4089, involving the installation of hollow metal door frames, security hardware, fire-rated sealant, additional fire sprinkler protection, interior lighting, and standardized NIST interior signage.
The selected contractor is responsible for providing all labor, materials, site protection, debris removal, and coordination necessary to meet NIST campus safety and construction standards. This procurement is classified under NAICS 236220 for Commercial and Institutional Building Construction and PSC Z2AA for Repair or Alteration of Office Buildings. It is designated as an SBA Small Business Administration set-aside. Five attachments accompany the solicitation, including a safety plan checklist, wage determination, physical access control standards, general contractor requirements, and the primary solicitation document.
Performance takes place in Boulder, Colorado, under the management of NIST point of contact Lauren Lopez. Interested parties must provide a list of individuals for a scheduled site visit by June 30, 2026, with the visit occurring on July 2, 2026. The deadline for submitting questions is July 6, 2026, and the final response deadline for proposals is July 15, 2026.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.