Name | Type | Posted | Actions |
|---|---|---|---|
https://dodprocurementtoolbox.com/ | LINK | Jun 11, 2026 | |
https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf | LINK | Jun 11, 2026 | |
https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml | LINK | Jun 11, 2026 | |
https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=W911KB27BA005¬iceType=SourcesSought | LINK | Jun 11, 2026 |
Lowell Creek Tunnel Refurbishment Seward, Alaska
Contact and place of performance
Jennifer Gosh
Seward, AK 99664
USA
THIS IS A SOURCES SOUGHT NOTICE ONLY FOR LOWELL CREEK TUNNEL REFURBISHMENT, SEWARD, ALAKSA. OFFERS OR BIDS WILL NOT BE ACCEPTED FOR THIS NOTICE. THIS IS NOT A PRE-SOLICITATION. The Alaska District of the U.S. Army Corps of Engineers is conducting market research to facilitate a determination of acquisition strategy prior to releasing a solicitation for this anticipated project. The determination of acquisition strate...
View moreThe Contractor shall furnish all labor, equipment, supplies, materials, supervision, and other items and services necessary to accomplish the work. The Contractor shall comply with commercial and industry standards as well as all applicable Federal, State, and local laws, regulations, and procedures.
The total estimated magnitude of construction for base and option items is between $10,000,000 and $25,000,000. The type of contract shall be firm-fixed price. Construction wage rates (formerly Davis Bacon Act wage rates) shall apply.
If the project is cancelled, all bid preparation costs will be borne by the offeror. If a large firm is selected for this contract, the firm must comply with FAR 52.219-9 regarding the requirements for a subcontracting plan for that part of the work it intends to subcontract.
All offerors are advised that they must be registered in the System for Award Management (SAM) (www.sam.gov) before submitting a bid. Joint ventures must also be registered in SAM as a joint venture. Offerors are advised to begin this process when they prepare their bid in order to ensure registration is in place should they be selected for award. Lack of registration in the SAM database would make an offeror ineligible for award.
The requirement for the submission of both performance and payment bonds in an amount equivalent to 100% of the award price shall be applicable. Therefore, the successful firm shall have the capability to acquire such bonding.
THIS IS A SOURCES SOUGHT OPEN TO ALL QUALIFIED PRIME CONTRACTOR FIRMS (Large and Small Businesses under NAICS 237990). All interested firms are encouraged to respond to this announcement no later than 30 June 2026, by 2:00 PM Alaska Time, by submitting all requested documentation listed below to: US Army Corps of Engineers, Alaska District, ATTN: CEPOA-CT (Gosh), PO Box 6898, JBER, AK 99506-0898 or via email to [email protected] and [email protected]. Interested prime contractor firms are encouraged to submit a capabilities package (not exceeding 5 pages) demonstrating the ability to perform the work described above. Packages should include the following information regarding their company:
1. Company Name, Address, UEI Number, Cage Code, Business Size under the applicable NAICS above, and Point of Contact information including email and phone number.
2. SAM status, Large or Small Business status under the applicable NAICS above, and type of small business (8a, HUBZone, Service-Disabled Veteran-Owned, Women-Owned, etc.)
3. Firm's single project bonding capability/limit.
4. Demonstration of the firm's experience as a prime contractor on projects of similar size, type, and complexity within the past 10 years. List actual projects completed and include project title, location, and a brief description of the project.
5. Your company's intent to propose on the Lowell Creek Tunnel Refurbishment project as a prime contractor. Interested parties are invited to submit a response to this Sources Sought by the response time stated above. Please submit all documentation by email in PDF format. Responses received after this time and date may not be reviewed.
The Department of the Army, U.S. Army Corps of Engineers Alaska District, is conducting market research through this Sources Sought notice to determine an acquisition strategy for the Lowell Creek Tunnel Refurbishment in Seward, Alaska. Identified by solicitation number W911KB27BA005, the project involves repairs to a 2,100-foot-long concrete-lined horseshoe tunnel that diverts Lowell Creek through Bear Mountain. The scope of work includes diverting the creek, removing loose concrete, replacing missing railroad rails and high-strength silica fume concrete, and repairing the tunnel invert with a metallic aggregate silica fume concrete overlay. The contractor will be responsible for furnishing all labor, equipment, and materials necessary to perform these repairs, which are expected to occur during the winter months to coincide with low stream flow.
This requirement is classified under NAICS 237990, Other Heavy and Civil Engineering Construction, and PSC Z2LC, Repair or Alteration of Tunnels and Subsurface Structures. The anticipated contract will be firm-fixed price with an estimated magnitude of construction between $10,000,000 and $25,000,000. Performance and payment bonds equivalent to 100% of the award price will be required, and construction wage rates apply. The government expects to award the contract in December 2026.
Interested large and small business prime contractors must submit capability packages demonstrating relevant experience on similar projects within the last ten years. Submissions are due by June 30, 2026, at 2:00 PM Alaska Time and should be directed to Jennifer Gosh. The notice includes one unnamed PDF attachment posted on June 11, 2026. Firms must be registered in the System for Award Management prior to award.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.