FL-ST. MARKS NWR-ROAD MATERIAL
Contact and place of performance
Sung, Robert
Not specified
FL-ST. MARKS NWR, FDOT Road Base, Rip Rap, and #57 Limerock. FL DOT approved Road Base delivered and tailgate spread. Road Base will be tailgate spread. Other material will be stockpiled. See attached solicitation packet. SOW is at the end of the packet. Road Base must originate from within approximately 80 miles of the delivery location to prevent invasive species contaminants. Contractor will provide a minimum of 5...
View moreThe U.S. Fish and Wildlife Service has issued this combined synopsis and solicitation under solicitation number 140F0S26Q0037 for the delivery and spreading of road materials at the St. Marks National Wildlife Refuge. The scope of work requires the provision of Florida Department of Transportation approved road base, rip rap, and #57 limerock. Road base material must be delivered and tailgate spread using a minimum of five dump trucks per day, while other materials will be stockpiled at the site. To prevent the introduction of invasive species, all road base must originate from within approximately 80 miles of the delivery location, and the use of semi-trucks with dump trailers is prohibited.
This procurement is designated as an EDWOSB (Economically Disadvantaged Women-Owned Small Business) set-aside under NAICS 212319, which covers Other Crushed and Broken Stone Mining and Quarrying, and PSC 5610 for Mineral Construction Materials, Bulk. Interested parties must submit their CAGE code, pricing, and a statement confirming their understanding of Florida Department of Transportation standards and the 80-mile sourcing requirement to Robert Sung. Each line item in the solicitation packet includes a not-to-exceed value, and vendors must specify the quantity of material they can provide for those stated amounts.
Responses are due by May 26, 2026. The solicitation includes three attachments posted on May 20, 2026: the primary solicitation document, a 1,339-page PDF regarding FDOT Standard Specifications for Road and Bridge Construction, and a supplemental solicitation file containing the statement of work and site maps. Questions regarding the requirement or requests for deadline extensions are handled by the primary point of contact via email.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.