Name | Type | Posted | Actions |
|---|---|---|---|
Solicitation Amendment N4523A26Q40330003 SF 30.pdf | Jun 11, 2026 | ||
Solicitation Amendment - N4523A26Q40330003.pdf | Jun 11, 2026 | ||
Solicitation Amendment N4523A26Q40330002 SF 30.pdf | Jun 4, 2026 | ||
Solicitation Amendment - N4523A26Q40330002.pdf | Jun 4, 2026 | ||
5343VL25 DID A003 DI-MISC-80678.pdf | May 27, 2026 | ||
5343VL25 A003 CDRL_Tapped_Lifting_Hole_Material_Test - Signed.pdf | May 27, 2026 | ||
5343VL25 A001 CDRL_COC - Signed.pdf | May 27, 2026 | ||
5343VL25 A004 CDRL_Hydrostatic_Test_Report_Material_Test - Signed.pdf | May 27, 2026 | ||
5343VL25 A007 CDRL_MT_Inspection_Report - Signed.pdf | May 27, 2026 | ||
5343VL25 A006 CDRL_Load_Test_Report - Signed.pdf | May 27, 2026 | ||
5343VL25 A002 CDRL_Drawing_Review - Signed.pdf | May 27, 2026 | ||
5343VL25 A008 CDRL_Certified_Dewatering_Procedure - Signed.pdf | May 27, 2026 | ||
5343VL25 A009 CDRL_CERTIFIED_REPORT_WEIGHT.pdf | May 27, 2026 | ||
5343VL25 DID A002 DI-SESS-81000F.pdf | May 27, 2026 | ||
5343VL25 A005 CDRL_Pre-Post_Load_Test_Inspection - Signed.pdf | May 27, 2026 | ||
5343VL25 DID A007 DI-NDTI-80809B.pdf | May 27, 2026 | ||
5343VL25 DID A004 DI-NDTI-80809B.pdf | May 27, 2026 | ||
5343VL25 Demin ODS.pdf | May 27, 2026 | ||
Solicitation Amendment N4523A26Q40330001 SF 30.pdf | May 27, 2026 | ||
Demineralizer SOW Rev 0.docx | DOCX | May 27, 2026 | |
Solicitation Amendment - N4523A26Q40330001.pdf | May 27, 2026 | ||
5343VL25 DID A006 DI-SESS-82038.pdf | May 27, 2026 | ||
5343VL25 DID A005 DI-MISC-81391A.pdf | May 27, 2026 | ||
5343VL25 DID A008 DI-MISC-81321A.pdf | May 27, 2026 |
N4523A26Q40330003 - Demineralizer- Full and Open Competition
The Department of the Navy, Puget Sound Naval Shipyard and Intermediate Maintenance Facility (PSNS&IMF), is seeking quotes for the fabrication and delivery of six demineralizer pressure vessels. These units must be preloaded with ion exchange resin and activated carbon according to shipyard operational standards. This procurement was originally a small business set-aside but has been amended to a full and open competition under solicitation N4523A26Q40330001. Submissions must include technical data sheets, part numbers, and pricing that covers all shipping and freight costs to Bremerton, Washington. A signed Standard Form 1449 and acknowledgment of all amendments are required for a quote to be considered. Evaluation will follow the technical and pricing factors outlined in the solicitation. The package includes a Statement of Work (SOW), multiple Contract Data Requirements Lists (CDRLs), and Data Item Descriptions (DIDs) that establish standards for hydrostatic testing, load testing, and magnetic particle inspections. Manufacturing cannot begin until the government approves drawings and material test results, and shipment is restricted until completed units are accepted. The technical scope is governed by a Statement of Work and nine CDRLs that define performance and reporting requirements. Engineering data, including dimensions and ratings, must be approved by the government before fabrication begins. Testing protocols for hydrostatic, load, and magnetic particle inspections must be documented and evaluated by the government before units are shipped. Technical performance must comply with the ASME Boiler and Pressure Vessel Code and naval standards for lifting and non-destructive testing. Vessels must handle design pressures from 29 inches Hg to 150 PSI at 140 degre…
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.
Contact and place of performance
Carolyn J. George
Bremerton, WA 98314
USA
3rd Amended Solicitation to extend the closing date. Amended Solicitation: The Small Business Set-Aside is hereby dissolved. This procurement is now Full and Open Competition. To ensure your quote is considered, please provide the following information: 1. Product Details: Specify the product you are offering, including its part number if applicable. Include a comprehensive specification sheet (e.g., Data Sheet...
View morePayment will be made only after proof of delivery.
6. Submission Requirements:
Sign Block 30a and Print your Name in Block 30b on the attached solicitation. This is mandatory for your quote to be considered responsive.
7. Evaluation Factors:
For a complete list of all factors used to evaluate quotes, please refer to clause 52.212-2.