Name | Type | Posted | Actions |
|---|---|---|---|
Amend 0001.pdf | Jun 11, 2026 | ||
26-0709 CLEAN HVAC SYSTEMS - PROJECT DESCRIPTION.pdf | Jun 9, 2026 | ||
26-0709 CLEAN HVAC SYSTEMS - ICRA 2.0 Clarifications.pdf | Jun 9, 2026 | ||
26-0709 CLEAN HVAC SYSTEMS - SOW.pdf | Jun 9, 2026 | ||
Combined DIV 01 specs small projects.pdf | Jun 9, 2026 | ||
26-0709 CLEAN HVAC SYSTEMS - SUBMITTAL REGISTER.pdf | Jun 9, 2026 | ||
Mech MACC RFP.pdf | Jun 9, 2026 | ||
FINAL Lejeune buildings 15 326 DD48 G770 NH200 and NH180 AHU cleaning SOW --5 Jun 2026.pdf | Jun 9, 2026 | ||
ICRA 2.0 DHA Fillable Final (1).pdf | Jun 9, 2026 | ||
MAXIMO Initial Equipment Inventory and Replacement.pdf | Jun 9, 2026 | ||
ufc_4_510_01_2023_c4.pdf | Jun 9, 2026 | ||
UFGS 23 01 30.41.pdf | Jun 9, 2026 | ||
Contractor Environmental Guide Updated Format_20231009 with ESOP.pdf | Jun 9, 2026 |
Buildings 15, 326, DD48, G770, NH180, NH200 Clean HVAC Systems
NAVFACSYSCOM Mid-Atlantic is seeking proposals to clean HVAC systems in six buildings at Naval Medical Center Camp Lejeune. The project involves cleaning 21 Air Handling Units (AHUs) in Buildings 15, 326, DD48, G770, NH180, and NH200. Work includes technical cleaning of coils, fans, and dampers, along with replacing drain pans and dampers in specific facilities. This is a small business set-aside under solicitation N4008526R9042, restricted to Mechanical MACC contractors Mechworks, North State Mechanical, and R&W Construction. The performance period is 120 days, with an estimated value between $500,000 and $1,000,000. Proposals are due by June 30, 2026. Because the work occurs in a medical environment, contractors must follow ICRA 2.0 protocols, maintain negative air pressure, and use HEPA-filtered exhaust. Administrative requirements include using the eCMS management system and submitting asset data via MAXIMO forms. Work in this clinical environment requires strict adherence to NADCA ACR-2021 and ICRA 2.0 protocols. Contractors must use digital monitoring for negative air pressure and HEPA-filtered exhaust. The project must be completed within 120 days of award, and delays carry liquidated damages of $880 per day. Operations must follow ICRA 2.0 and NADCA ACR-2021 standards. Medical areas require negative air pressure with digital monitoring and HEPA-filtered exhaust. One person may serve as Superintendent, QC Manager, and Safety & Health Officer if they meet all qualifications.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.
Contact and place of performance
Clifton Gaither
Camp Lejeune, NC 28547
USA
Only Mechanical MACC Contractors listed on the General Requirements cover page may submit a proposal for this ROICC Camp Lejeune area of responsibility project. See attached documents for scope of work and any applicable drawings.