IIJA FUNDED. ASHBURN, GA (QHN) ARSR JCN:20008134
THIS UNILATERAL AWARD IS FOR THE CONSTRUCTION COST OF THE UPS AND UPS ANCILLARY EQUIPMENT REMOVAL AND INSTALLATION AT ASHBURN, GA (QHN) ARSR.
THIS UNILATERAL AWARD IS FOR THE CONSTRUCTION COST OF THE UPS AND UPS ANCILLARY EQUIPMENT REMOVAL AND INSTALLATION AT COOPERSVILLE, MI (CPV) ARSR WHICH INCLUDES A FULL POWER SYSTEMS STUDY OF THE FACILITY. JCN: 21000077
IIJA FUNDED. KANSAS CITY, MO (MCI) ATCT JCN: 26000505 THIS UNILATERAL AWARD IS FOR THE CONSTRUCTION COST OF THE UPS AND UPS ANCILLARY EQUIPMENT REMOVAL AND INSTALLATION AT KANSAS CITY, MO (MCI) ATCT WHICH INCLUDES A FULL POWER SYSTEMS STUDY OF THE
IIJA FUNDED. CITRONELLE, AL (QRB) ARSR JCN:18066545 THIS UNILATERAL AWARD IS FOR THE CONSTRUCTION COST OF THE UPS AND UPS ANCILLARY EQUIPMENT REMOVAL AND INSTALLATION AT CITRONELLE, AL (QRB) ARSR WHICH INCLUDES A FULL POWER SYSTEMS STUDY OF THE FAC
IIJA FUNDED. SLIDELL, LA (SIL) ARSR JCN:26000506 THIS UNILATERAL AWARD IS FOR THE CONSTRUCTION COST OF THE UPS AND UPS ANCILLARY EQUIPMENT REMOVAL AND INSTALLATION AT SLIDELL, LA (SIL) ARSR WHICH INCLUDES A FULL POWER SYSTEMS STUDY OF THE FACILITY.
IIJA FUNDED. FREELAND, MI (MBS) ASR JCN:18066401 THIS UNILATERAL AWARD IS FOR THE CONSTRUCTION COST OF THE UPS AND UPS ANCILLARY EQUIPMENT REMOVAL AND INSTALLATION AT FREELAND, MI (MBS) ASR WHICH INCLUDES A FULL POWER SYSTEMS STUDY OF THE FACILITY.
IIJA FUNDED. ROCHESTER, MN (RSTB) ASR JCN: 24010113 THIS UNILATERAL AWARD IS FOR THE CONSTRUCTION COST OF THE UPS AND UPS ANCILLARY EQUIPMENT REMOVAL AND INSTALLATION AT ROCHESTER, MN (RSTB) ASR, WHICH INCLUDES A FULL POWER SYSTEMS STUDY OF THE FACI
IIJA FUNDED. MUSKEGON, MI (MKGE) ASR JCN: 22007976 THIS UNILATERAL AWARD IS FOR THE CONSTRUCTION COST OF THE UPS AND UPS ANCILLARY EQUIPMENT REMOVAL AND INSTALLATION AT MUSKEGON, MI (MKGE) ASR, WHICH INCLUDES A FULL POWER SYSTEMS STUDY OF THE FACILI
IIJA FUNDED. FLINT, MI (FNT) ASR JCN: 19005396 THIS UNILATERAL AWARD IS FOR THE CONSTRUCTION COST OF THE UPS AND UPS ANCILLARY EQUIPMENT REMOVAL AND INSTALLATION AT FLINT, MI (FNT) ASR, WHICH INCLUDES A FULL POWER SYSTEMS STUDY OF THE FACILITY.
BIL FUNDS. CONSTRUCTION COST OF UPS AND THE UPS ANCILLARY EQUIPMENT REMOVAL AND INSTALLATION AT THE GULFPORT, MS (GPT) ASR PER THE RFQ-24-25 BID PACKAGE. JCN: 18066536 INCLUDES OPTION #1 FULL ARC FLASH HAZARD ANALYSIS (AFHA) OF THE FACILITY.
BIL FUNDS. CONSTRUCTION COST OF UPS AND THE UPS ANCILLARY EQUIPMENT REMOVAL AND INSTALLATION AT THE ROSWELL, NM (ROW) ASR PER THE RFQ-24-23 BID PACKAGE. JCN: 24010109 INCLUDES OPTION #1 FULL ARC FLASH HAZARD ANALYSIS (AFHA) OF THE FACILITY.
BIL FUNDS. CONSTRUCTION COST OF UPS AND THE UPS ANCILLARY EQUIPMENT REMOVAL AND INSTALLATION AT THE KIRKSVILLE, MO (IRK) ARSR PER THE RFQ-24-21 BID PACKAGE. JCN:18060881
BIL FUNDS. CONSTRUCTION COST OF UPS AND THE UPS ANCILLARY EQUIPMENT REMOVAL AND INSTALLATION AT THE DALLAS, TX, (DFWA) ASR PER THE RFQ-24-18 BID PACKAGE. JCN:22004412 INCLUDES OPTION #1 FULL ARC FLASH HAZARD ANALYSIS (AFHA) OF THE FACILITY.
UPS INSTALLATION. JCN:18065273 LOC: DCA TDWR, WASHINGTON DC. CONSTRUCTION COST OF UPS AND UPS ANCILLARY EQUIPMENT REMOVAL AND INSTALLATION AT WASHINGTON, DC PER RFQ-24-07 BID PACKAGE, WHICH INCLUDES FULL ARC FLASH HAZARD ANALYSIS (AFHA) OF THE FAC
BIL UPS INSTALLATION. JCN:22004515, LOC: IADB PCS, LEESBURG VA. CONSTRUCTION COST OF UPS AND UPS ANCILLARY EQUIPMENT REMOVAL AND INSTALLATION AT LEESBURG, VA PER RFQ-24-07 BID PACKAGE. PACKAGE INCLUDES THE FULL ARC FLASH HAZARD ANALYSIS (AFHA) OF TH
BIL UPS INSTALLATION. JCN:18066525, LOC: PIT TDWR, PITTSBURGH PA. CONSTRUCTION COST OF UPS AND UPS ANCILLARY EQUIPMENT REMOVAL AND INSTALLATION AT PITTSBURGH, PA PER RFQ 24-06 BID PACKAGE. INCLUDES OPTION #1 FULL ARC FLASH HAZARD ANALYSIS (AFHA) OF
BIL-UPS REPLACEMENT ON THE MSP TDWR, LOCATED IN MINNEAPOLIS, MN. IAW MINNEAPOLIS, MN (MSP) - TDWR SUSTAINMENT INSTALLATION SOW(2) AND MSP-TDWR-18066415-DESIGN-10-25-2021-FINAL. JCN:22002359