Analyze awards, watch incumbents and competitors, track new transactions or changes, and use award history to shape recompete and capture strategy.
Award ID | Description | Recipient | Total Value | Awarding Agency | Funding Agency | Set Aside | NAICS | PSC | Award Date | Start Date | End Date | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ALIGNMENT PINS FOR CIRS INSTRUMENTS | CENTRAL ENGINEERING, INC. | $3,880 | NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION | NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION | — | 332710Machine Shops | N066INSTALLATION OF EQUIPMENT- INSTRUMENTS AND LABORATORY EQUIPMENT | Oct 5, 2020 | Oct 5, 2020 | Oct 21, 2020 | ||
| SB SET-ASIDE, 42 OFFERS.BPA VENDORS SHALL PROVIDE FABRICATION SERVICES AT VENDORS SITE&SUPPLIES TO GSFC IN THEIR RESPECTIVE AREAS OF EXPERTISE FOR THE DEVELOPMENT OF INSTRUMENTS SPACE FLIGHT&NON-SPACEFLIGHT HARDWARE INTERCHANGEABLE PIECE PARTS. | CENTRAL ENGINEERING, INC. | $1,262,702 | NATIONAL AERONAUTICS AND SPACE ADMINISTRATION | NATIONAL AERONAUTICS AND SPACE ADMINISTRATION | — | 332999All Other Miscellaneous Fabricated Metal Product Manufacturing | 1675SPACE VEHICLE COMPONENTS | Jul 15, 2020 | Jul 15, 2020 | Dec 14, 2025 | ||
| IGF::OT::IGF COMPREHENSIVE FABRICATION NEEDS FOR SPACEFLIGHT HARDWARE PARTS, INSTRUMENT COMPONENTS, STRUCTURES, FIXTURES, ASSEMBLY TOOLS, SPACE VEHICLE PARTS, ETC.; ASSEMBLY OF FABRICATED ITEMS AND ALL REQUIRED DOCUMENTATION. THE CONTRACTOR SHALL MANUFACTURE, ASSEMBLE, AND PREPARE DOCUMENTATION FOR SPACEFLIGHT AND NON-FLIGHT PARTS IN SUPPORT OF THE MANUFACTURING ENGINEERING GROUP AND GSFC PROJECTS. THE CONTRACTOR SHALL PROVIDE THE REQUIRED PERSONNEL, FACILITIES, AND MATERIALS, UNLESS OTHERWISE PROVIDED BY THE GOVERNMENT, TO ACCOMPLISH THE ISSUED DELIVERY ORDERS. THE CONTRACTOR SHALL PROVIDE EMERGENCY REPAIR OR MODIFICATION IN SUPPORT OF REJECTED OR DEFECTIVE CRITICAL ITEMS; THIS INCLUDES PERFORMING REPAIR OR MODIFICATION AND RETURNING TO GSFC WITHIN A NEGOTIATED TIME FRAME PER DELIVERY ORDER. THE CONTRACTOR SHALL FACILITATE TECHNICAL INTERCHANGE MEETINGS AT THE CONTRACTOR S FABRICATION FACILITY FOR DESIGN INTERPRETATION FOR WORK IN PROGRESS AND CONTRACTOR/END-USER COLLABORATION FOR CRITICAL ITEMS WITHIN A NEGOTIATED TIME FRAME PER DELIVERY ORDER. CRITICAL ITEMS ARE DEFINED AS THOSE SPACEFLIGHT AND GROUND SUPPORT ITEMS HAVING A SIGNIFICANT IMPACT ON TEST SCHEDULES, ASSEMBLY SCHEDULES, OR SHIPPING SCHEDULES AFFECTING LAUNCH SCHEDULES. APPROXIMATELY 40% OF THE WORK TO BE PERFORMED ON THIS CONTRACT WILL BE CONSIDERED CRITICAL. | CENTRAL ENGINEERING, INC. | $42,616 | NATIONAL AERONAUTICS AND SPACE ADMINISTRATION | NATIONAL AERONAUTICS AND SPACE ADMINISTRATION | — | 332710Machine Shops | AZ15 | Mar 4, 2015 | Mar 4, 2015 | May 14, 2020 | ||
| IGF::OT::IGF SMALL BUSINESS SET-ASIDE, 63 OFFERS PLACE OF PERFORMANCE: VENDOR SITE FABRICATION OF COMMERCIAL SERVICES AND SUPPLIES FOR GODDARD SPACE FLIGHT CENTER THE ADVANCED MANUFACTURING BRANCH (AMB) IS RESPONSIBLE FOR MAINTAINING A COMPLETE MANUFACTURING FACILITY TO MEET THE CENTER'S RESEARCH AND DEVELOPMENT REQUIREMENTS AND ASSIST IN THE FABRICATION OF HARDWARE REQUIREMENTS FROM MULTIPLE NASA PROJECT MISSIONS. THIS FACILITY INCLUDES CONVENTIONAL MACHINING EQUIPMENT, NUMERICALLY CONTROLLED (NC) MACHINING CENTERS, SHEET METAL AND WELDING FABRICATION EQUIPMENT AND REMOTELY LOCATED STAFF SHOPS. VENDORS SHALL PROVIDE FABRICATION SERVICES AND SUPPLIES TO THE MANUFACTURING ENGINEERING GROUP IN THEIR RESPECTIVE AREAS OF EXPERTISE FOR THE DEVELOPMENT OF INSTRUMENTS AND SPACE FLIGHT AND NON-SPACEFLIGHT HARDWARE INTERCHANGEABLE PIECE PARTS. VENDORS WILL MANUFACTURE PER ENGINEERING DRAWINGS WITH AEROSPACE INDUSTRY TOLERANCES AND PROVIDE FABRICATION CAPABILITIES IN ACCORDANCE WITH THE STATEMENT OF WORK. TO FABRICATE CLOSE TOLERANCE AEROSPACE INSTRUMENTS AND SPACE FLIGHT GRADE PARTS, IN VARIOUS MATERIALS SUCH AS (BUT NOT LIMITED TO) ALUMINUM, TITANIUM, HIGH STRENGTH STEEL AND NICKEL ALLOY, ENGINEERING PLASTICS, AND COMPOSITES BASED ON INDUSTRY ENGINEERING DRAWINGS, PROVIDED IN ELECTRONIC FORMAT, TO INDUSTRY STANDARD TOLERANCES AND SPECIFICATIONS. PARTS MAY RANGE IN COMPLEXITY FROM VERY SIMPLE TO VERY COMPLEX, WITH QUANTITIES. EACH DISCIPLINE IS FURTHER DIVIDED INTO SUBCATEGORIES BASED ON THE EXPECTED SIZE OF FABRICATED PARTS. THE FABRICATIONS OF PRODUCTS OR SERVICES PROPOSED AS "SPACEFLIGHT" ARE REQUIRED TO BE, ISO 900I OR AS9100 COMPLAINT, ITEMS PROPOSED AS "NON-FLIGHT" WILL NOT REQUIRE RESPONDENTS TO BE ISO 9001 OR AS9100 COMPLIANT. OFFERS SHALL INDICATE IF THEY ARE ISO 9001 OR AS9100 COMPLAINT AND PROVIDE SUPPORTING DOCUMENTATION. | CENTRAL ENGINEERING, INC. | $1,869,527 | NATIONAL AERONAUTICS AND SPACE ADMINISTRATION | NATIONAL AERONAUTICS AND SPACE ADMINISTRATION | — | 332710Machine Shops | AZ15 | Aug 26, 2014 | Aug 26, 2014 | May 14, 2020 | ||
| COMPREHENSIVE FABRICATION NEEDS FOR SPACEFLIGHT HARDWARE PARTS, INSTRUMENT COMPONENTS, STRUCTURES, FIXTURES, ASSEMBLY TOOLS, SPACE VEHICLE PARTS, ETC.; ASSEMBLY OF FABRICATED ITEMS AND ALL REQUIRED DOCUMENTATION. THE CONTRACTOR SHALL MANUFACTURE, ASSEMBLE, AND PREPARE DOCUMENTATION FOR SPACEFLIGHT AND NON-FLIGHT PARTS IN SUPPORT OF THE MANUFACTURING ENGINEERING GROUP AND GSFC PROJECTS. THE CONTRACTOR SHALL PROVIDE THE REQUIRED PERSONNEL, FACILITIES, AND MATERIALS, UNLESS OTHERWISE PROVIDED BY THE GOVERNMENT, TO ACCOMPLISH THE ISSUED DELIVERY ORDERS. THE CONTRACTOR SHALL PROVIDE EMERGENCY REPAIR OR MODIFICATION IN SUPPORT OF REJECTED OR DEFECTIVE CRITICAL ITEMS; THIS INCLUDES PERFORMING REPAIR OR MODIFICATION AND RETURNING TO GSFC WITHIN A NEGOTIATED TIME FRAME PER DELIVERY ORDER. THE CONTRACTOR SHALL FACILITATE TECHNICAL INTERCHANGE MEETINGS AT THE CONTRACTOR S FABRICATION FACILITY FOR DESIGN INTERPRETATION FOR WORK IN PROGRESS AND CONTRACTOR/END-USER COLLABORATION FOR CRITICAL ITEMS WITHIN A NEGOTIATED TIME FRAME PER DELIVERY ORDER. CRITICAL ITEMS ARE DEFINED AS THOSE SPACEFLIGHT AND GROUND SUPPORT ITEMS HAVING A SIGNIFICANT IMPACT ON TEST SCHEDULES, ASSEMBLY SCHEDULES, OR SHIPPING SCHEDULES AFFECTING LAUNCH SCHEDULES. APPROXIMATELY 40% OF THE WORK TO BE PERFORMED ON THIS CONTRACT WILL BE CONSIDERED CRITICAL. | CENTRAL ENGINEERING, INC. | $0 | NATIONAL AERONAUTICS AND SPACE ADMINISTRATION | NATIONAL AERONAUTICS AND SPACE ADMINISTRATION | — | 332710Machine Shops | AZ15 | Nov 17, 2009 | Nov 17, 2009 | Aug 17, 2014 | ||
| COMPREHENSIVE FABRICATION NEEDS FOR SPACEFLIGHT HARDWARE PARTS, INSTRUMENT COMPONENTS, STRUCTURES, FIXTURES, ASSEMBLY TOOLS, SPACE VEHICLE PARTS, ETC.; ASSEMBLY OF FABRICATED ITEMS AND ALL REQUIRED DOCUMENTATION. THE CONTRACTOR SHALL MANUFACTURE, ASSEMBLE, AND PREPARE DOCUMENTATION FOR SPACEFLIGHT AND NON-FLIGHT PARTS IN SUPPORT OF THE MANUFACTURING ENGINEERING GROUP AND GSFC PROJECTS. THE CONTRACTOR SHALL PROVIDE THE REQUIRED PERSONNEL, FACILITIES, AND MATERIALS, UNLESS OTHERWISE PROVIDED BY THE GOVERNMENT, TO ACCOMPLISH THE ISSUED DELIVERY ORDERS. THE CONTRACTOR SHALL PROVIDE EMERGENCY REPAIR OR MODIFICATION IN SUPPORT OF REJECTED OR DEFECTIVE CRITICAL ITEMS; THIS INCLUDES PERFORMING REPAIR OR MODIFICATION AND RETURNING TO GSFC WITHIN A NEGOTIATED TIME FRAME PER DELIVERY ORDER. THE CONTRACTOR SHALL FACILITATE TECHNICAL INTERCHANGE MEETINGS AT THE CONTRACTOR S FABRICATION FACILITY FOR DESIGN INTERPRETATION FOR WORK IN PROGRESS AND CONTRACTOR/END-USER COLLABORATION FOR CRITICAL ITEMS WITHIN A NEGOTIATED TIME FRAME PER DELIVERY ORDER. CRITICAL ITEMS ARE DEFINED AS THOSE SPACEFLIGHT AND GROUND SUPPORT ITEMS HAVING A SIGNIFICANT IMPACT ON TEST SCHEDULES, ASSEMBLY SCHEDULES, OR SHIPPING SCHEDULES AFFECTING LAUNCH SCHEDULES. APPROXIMATELY 40% OF THE WORK TO BE PERFORMED ON THIS CONTRACT WILL BE CONSIDERED CRITICAL. | CENTRAL ENGINEERING, INC. | $0 | NATIONAL AERONAUTICS AND SPACE ADMINISTRATION | NATIONAL AERONAUTICS AND SPACE ADMINISTRATION | — | 332710Machine Shops | AZ15 | Nov 10, 2009 | Nov 10, 2009 | Aug 17, 2014 | ||
| FABRICATION BLANKET PURCHASE AGREEMENT. | CENTRAL ENGINEERING, INC. | $0 | NATIONAL AERONAUTICS AND SPACE ADMINISTRATION | — | — | 332710Machine Shops | 3470MACHINE SHOP SETS, KITS, AND OUTFITS | May 12, 2009 | May 12, 2009 | — | ||
| FABRICATION BPA THRU CALL #2 | CENTRAL ENGINEERING, INC. | $0 | NATIONAL AERONAUTICS AND SPACE ADMINISTRATION | — | — | 332710Machine Shops | 3470MACHINE SHOP SETS, KITS, AND OUTFITS | Jun 14, 2007 | Jun 14, 2007 | — | ||
| FABRICATION BPA THRU CALL #602 | CENTRAL ENGINEERING, INC. | $0 | NATIONAL AERONAUTICS AND SPACE ADMINISTRATION | — | — | 332710Machine Shops | 3470MACHINE SHOP SETS, KITS, AND OUTFITS | May 29, 2007 | May 29, 2007 | — |