Analyze awards, watch incumbents and competitors, track new transactions or changes, and use award history to shape recompete and capture strategy.
Award ID | Description | Recipient | Total Value | Awarding Agency | Funding Agency | Set Aside | NAICS | PSC | Award Date | Start Date | End Date | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| THE CONTRACTOR SHALL REMARK/REPAINT AND MATCH ALL EXITING STRIPING AS INDICATED IN THE WORK DESCRIPTION WITHIN THE SOW AND AS SHOWN ON THE INCLUDED AIRFIELD SITE PLAN. | NWF CONTRACTORS INC | $83,465 | DEPT OF THE AIR FORCE | DEPT OF THE AIR FORCE | — | 237310Highway, Street, and Bridge Construction | Z1BDMAINTENANCE OF AIRPORT RUNWAYS AND TAXIWAYS | Mar 3, 2026 | Mar 2, 2026 | May 18, 2026 | ||
| WORK TO BE PERFORMED UNDER THIS TASK ORDER WILL BE IN ACCORDANCE WITH THE STATEMENT OF WORK, ACCEPTED PROPOSAL AND DRAWINGS ATTACHED IN SECTION J | NWF CONTRACTORS INC | $1,672,612 | DEPT OF THE AIR FORCE | DEPT OF THE AIR FORCE | — | 237310Highway, Street, and Bridge Construction | Y1LBCONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS | Sep 24, 2025 | Sep 30, 2025 | Feb 3, 2026 | ||
| CONTRACTOR SHALL FURNISH ALL PLANT, LABOR, EQUIPMENT, MATERIALS, FACILITIES, AND TRANSPORTATION NECESSARY TO REPAIR SEWER LINES, IAW THE DRAWINGS AND SPECIFICATIONS. | NWF CONTRACTORS INC | $140,793 | DEPT OF THE AIR FORCE | DEPT OF THE AIR FORCE | — | 237310Highway, Street, and Bridge Construction | Z2JZREPAIR OR ALTERATION OF MISCELLANEOUS BUILDINGS | Sep 18, 2025 | Sep 18, 2025 | Jul 5, 2026 | ||
| THIS IS A CIVIL WORKS IDIQ CONTRACT FOR WORK CONSISTING OF, BUT NOT LIMITED TO, REPAIR, REPLACEMENT, AND MINOR CONSTRUCTION OF BASE PAVEMENTS, WATER DISTRIBUTION SYSTEMS, AND OTHER RELATED WORK AT HURLBURT FIELD, FL. | NWF CONTRACTORS INC | $107,059 | DEPT OF THE AIR FORCE | DEPT OF THE AIR FORCE | — | 237310Highway, Street, and Bridge Construction | Y1LBCONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS | Sep 12, 2025 | Sep 26, 2025 | May 25, 2026 | ||
| THIS IS A CIVIL WORKS IDIQ CONTRACT FOR WORK CONSISTING OF, BUT NOT LIMITED TO, REPAIR, REPLACEMENT, AND MINOR CONSTRUCTION OF BASE PAVEMENTS, WATER DISTRIBUTION SYSTEMS, AND OTHER RELATED WORK AT HURLBURT FIELD, FL. | NWF CONTRACTORS INC | $35,470 | DEPT OF THE AIR FORCE | DEPT OF THE AIR FORCE | — | 237310Highway, Street, and Bridge Construction | Y1LBCONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS | Sep 4, 2025 | Sep 4, 2025 | Oct 19, 2025 | ||
| CONSTRUCT CONCRETE TARGETS REQUIREMENTS CONTRACT IAW: - SPECIFICATIONS C-VE-23-01 DATED 13 MARCH 2023 - DRAWINGS 23-TA-C74-01 R1 DATED 13 MARCH 2023 | NWF CONTRACTORS INC | $494,846 | DEPT OF THE AIR FORCE | DEPT OF THE AIR FORCE | — | 238110Poured Concrete Foundation and Structure Contractors | Y1PZCONSTRUCTION OF OTHER NON-BUILDING FACILITIES | Sep 2, 2025 | Sep 2, 2025 | Jan 28, 2026 | ||
| THIS IS A CIVIL WORKS IDIQ CONTRACT FOR WORK CONSISTING OF, BUT NOT LIMITED TO, REPAIR, REPLACEMENT, AND MINOR CONSTRUCTION OF BASE PAVEMENTS, WATER DISTRIBUTION SYSTEMS, AND OTHER RELATED WORK AT HURLBURT FIELD, FL. | NWF CONTRACTORS INC | $299,802 | DEPT OF THE AIR FORCE | DEPT OF THE AIR FORCE | — | 237310Highway, Street, and Bridge Construction | Y1LBCONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS | Sep 2, 2025 | Sep 2, 2025 | Mar 21, 2026 | ||
| THE CONTRACTOR SHALL FURNISH ALL LABOR, MATERIALS, TOOLS, SUPERVISION AND EQUIPMENT AND PERFORM ALL OPERATIONS NECESSARY TO REPAIR BY REPLACEMENT THE AUTOMATIC ACCESS GATE TO THE FLIGHTLINE. | NWF CONTRACTORS INC | $57,541 | DEPT OF THE AIR FORCE | DEPT OF THE AIR FORCE | — | 237310Highway, Street, and Bridge Construction | Z2PZREPAIR OR ALTERATION OF OTHER NON-BUILDING FACILITIES | Aug 18, 2025 | Aug 18, 2025 | Jan 15, 2026 | ||
| REPAIR HOT WATER SUPPLY AND RETURN LINES ON THE BUILDING 1 BOILER | NWF CONTRACTORS INC | $470,257 | DEPT OF THE AIR FORCE | DEPT OF THE AIR FORCE | — | 237310Highway, Street, and Bridge Construction | J045MAINT/REPAIR/REBUILD OF EQUIPMENT- PLUMBING, HEATING, AND WASTE DISPOSAL EQUIPMENT | Aug 15, 2025 | Aug 18, 2025 | Dec 5, 2025 | ||
| CP1144587 EOD ARMAG WORK TO BE PERFORMED UNDER THIS TASK ORDER WILL BE IN ACCORDANCE WITH THE STATEMENT OF WORK, ACCEPTED PROPOSAL AND DRAWINGS ATTACHED IN SECTION J. | NWF CONTRACTORS INC | $161,290 | DEPT OF THE AIR FORCE | DEPT OF THE AIR FORCE | — | 237310Highway, Street, and Bridge Construction | Y1LBCONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS | Aug 13, 2025 | Aug 15, 2025 | Jan 9, 2026 | ||
| REPAIR SEVEN STORMWATER SYSTEMS AROUND HURLBURT FIELD, FLORIDA. | NWF CONTRACTORS INC | $195,824 | DEPT OF THE AIR FORCE | DEPT OF THE AIR FORCE | — | 237310Highway, Street, and Bridge Construction | Y1LBCONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS | May 15, 2025 | May 29, 2025 | Mar 5, 2026 | ||
| REPLACE TWO CONCRETE SLABS ON RUNWAY 18/36 | NWF CONTRACTORS INC | $27,601 | DEPT OF THE AIR FORCE | DEPT OF THE AIR FORCE | — | 237310Highway, Street, and Bridge Construction | Y1LBCONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS | May 12, 2025 | May 12, 2025 | Jul 11, 2025 | ||
| DUKE FIELD RUNWAY FRICTION TEST | NWF CONTRACTORS INC | $25,657 | DEPT OF THE AIR FORCE | DEPT OF THE AIR FORCE | — | 237310Highway, Street, and Bridge Construction | Y1LBCONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS | Apr 30, 2025 | Apr 29, 2025 | May 19, 2025 | ||
| CONSTRUCT CONCRETE TARGETS REQUIREMENTS CONTRACT IAW: - SPECIFICATIONS C-VE-23-01 DATED 13 MARCH 2023- DRAWINGS 23-TA-C74-01 R1 DATED 13 MARCH 2023 | NWF CONTRACTORS INC | $398,264 | DEPT OF THE AIR FORCE | DEPT OF THE AIR FORCE | — | 238110Poured Concrete Foundation and Structure Contractors | Y1PZCONSTRUCTION OF OTHER NON-BUILDING FACILITIES | Apr 21, 2025 | Apr 24, 2025 | Oct 24, 2025 | ||
| CONSTRUCT CONCRETE TARGETS REQUIREMENTS CONTRACT IAW: - SPECIFICATIONS C-VE-23-01 DATED 13 MARCH 2023- DRAWINGS 23-TA-C74-01 R1 DATED 13 MARCH 2023 | NWF CONTRACTORS INC | $276,780 | DEPT OF THE AIR FORCE | DEPT OF THE AIR FORCE | — | 238110Poured Concrete Foundation and Structure Contractors | Y1PZCONSTRUCTION OF OTHER NON-BUILDING FACILITIES | Feb 21, 2025 | Feb 20, 2025 | Jul 21, 2025 | ||
| CONSTRUCT CONCRETE TARGETS REQUIREMENTS CONTRACT IAW: - SPECIFICATIONS C-VE-23-01 DATED 13 MARCH 2023- DRAWINGS 23-TA-C74-01 R1 DATED 13 MARCH 2023 | NWF CONTRACTORS INC | $74,430 | DEPT OF THE AIR FORCE | DEPT OF THE AIR FORCE | — | 238110Poured Concrete Foundation and Structure Contractors | Y1PZCONSTRUCTION OF OTHER NON-BUILDING FACILITIES | Dec 18, 2024 | Dec 18, 2024 | Mar 3, 2025 | ||
| THIS IS A TASK ORDER OFF OF THE CIVIL WORKS IDIQ CONTRACT FOR ANNUAL RUBBER REMOVAL REQUIREMENT | NWF CONTRACTORS INC | $159,123 | DEPT OF THE AIR FORCE | DEPT OF THE AIR FORCE | — | 237310Highway, Street, and Bridge Construction | Y1LBCONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS | Dec 3, 2024 | Jan 1, 2025 | Apr 21, 2025 | ||
| REPAINT RUNWAY EDGE LINES | NWF CONTRACTORS INC | $195,381 | DEPT OF THE AIR FORCE | DEPT OF THE AIR FORCE | — | 237310Highway, Street, and Bridge Construction | Y1LBCONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS | Dec 3, 2024 | Jan 7, 2025 | Feb 18, 2025 | ||
| CONSTRUCT CONCRETE TARGETS REQUIREMENTS CONTRACT IAW: - SPECIFICATIONS C-VE-23-01 DATED 13 MARCH 2023- DRAWINGS 23-TA-C74-01 R1 DATED 13 MARCH 2023 | NWF CONTRACTORS INC | $6,460 | DEPT OF THE AIR FORCE | DEPT OF THE AIR FORCE | — | 238110Poured Concrete Foundation and Structure Contractors | Y1PZCONSTRUCTION OF OTHER NON-BUILDING FACILITIES | Nov 5, 2024 | Nov 6, 2024 | Dec 21, 2024 | ||
| THE CONTRACTOR SHALL FURNISH ALL LABOR, MATERIALS, TOOLS, SUPERVISION, AND EQUIPMENT AND PERFORM ALL OPERATIONS NECESSARY TO ACCOMPLISH ALL WORK COMPLETE TO INSTALL COMMUNICATIONS INFRASTRUCTURE TO BUILDING 91360, WITHIN HURLBURT FIELD, FL. | NWF CONTRACTORS INC | $147,978 | DEPT OF THE AIR FORCE | DEPT OF THE AIR FORCE | — | 237310Highway, Street, and Bridge Construction | 4510PLUMBING FIXTURES AND ACCESSORIES | Sep 28, 2024 | Oct 11, 2024 | Feb 17, 2025 | ||
| THE WORK CONSISTS OF, BUT NOT LIMITED TO, REPAIR, REPLACEMENT, AND MINOR CONSTRUCTION OF BASE PAVEMENTS, WATER DISTRIBUTION SYSTEMS, WASTEWATER DISTRIBUTION SYSTEMS, AND OTHER RELATED WORK AT HURLBURT FIELD, FL. | NWF CONTRACTORS INC | $41,635 | DEPT OF THE AIR FORCE | DEPT OF THE AIR FORCE | — | 237310Highway, Street, and Bridge Construction | 5660FENCING, FENCES, GATES AND COMPONENTS | Sep 10, 2024 | Sep 16, 2024 | Dec 6, 2024 | ||
| THIS IS A CIVIL WORKS IDIQ CONTRACT FOR WORK CONSISTING OF, BUT NOT LIMITED TO, REPAIR, REPLACEMENT, AND MINOR CONSTRUCTION OF BASE PAVEMENTS, WATER DISTRIBUTION SYSTEMS, AND OTHER RELATED WORK AT HURLBURT FIELD, FL. | NWF CONTRACTORS INC | $11,826 | DEPT OF THE AIR FORCE | DEPT OF THE AIR FORCE | — | 237310Highway, Street, and Bridge Construction | Y1JZCONSTRUCTION OF MISCELLANEOUS BUILDINGS | Sep 6, 2024 | Sep 16, 2024 | Nov 26, 2024 | ||
| THE CONTRACTOR SHALL FURNISH ALL LABOR, MATERIALS, TOOLS, SUPERVISION AND EQUIPMENT AND PERFORM ALL OPERATIONS NECESSARY TO REPAIR VCP SEWER LINES WITHIN BASIN 2. THE PROJECT IS LOCATED ON HURLBURT FIELD, FL. | NWF CONTRACTORS INC | $270,695 | DEPT OF THE AIR FORCE | DEPT OF THE AIR FORCE | — | 237310Highway, Street, and Bridge Construction | Y1LBCONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS | Jul 11, 2024 | Jul 15, 2024 | Mar 18, 2025 | ||
| THE WORK IS BUT NOT LIMITED TO REPAIR, REPLACEMENT, AND MINOR CONSTRUCTION OF BASE PAVEMENTS, WATER DISTRIBUTION SYSTEMS, WASTEWATER DISTRIBUTION SYSTEMS, AND OTHER RELATED WORK AT HURLBURT FIELD, FL. | NWF CONTRACTORS INC | $304,758 | DEPT OF THE AIR FORCE | DEPT OF THE AIR FORCE | — | 237310Highway, Street, and Bridge Construction | Y1LZCONSTRUCTION OF PARKING FACILITIES | Jul 5, 2024 | Jul 15, 2024 | Oct 17, 2024 | ||
| THE WORK TO BE PERFORMED IN ACCORDANCE WITH SOW TO INCLUDE, BUT NOT LIMITED TO: 1. CRACK REPAIRS WILL BE SEALED WITH BACKER ROD AND COLD APPLIED JOINT SEAL.2. SPALLS TO BE REPAIRED WITHIN LIMITS OF THE EAST RAMP AND RUNWAY AS SHOWN ON THE PLANS | NWF CONTRACTORS INC | $349,113 | DEPT OF THE AIR FORCE | DEPT OF THE AIR FORCE | — | 237310Highway, Street, and Bridge Construction | Z1BDMAINTENANCE OF AIRPORT RUNWAYS AND TAXIWAYS | Jun 13, 2024 | Jun 13, 2024 | Apr 9, 2025 |