Average obligated amount per year since period start.
Portion of total contract value already obligated.
Share of total value represented by subawards.
THE UNITED STATES MARINE CORPS (USMC) HAS A REQUIREMENT TO INSPECT THE CLEVISES AND REMOVE/REPLACE THE ELEVATION PIVOT BOLTS ON THE ENTIRE FLEET OF HIGH MOBILITY ARTILLERY ROCKET SYSTEMS (HIMARS) VEHICLES. IN THE FALL OF 2014, CRACKS WERE DISCOVERED ON THREE ARMY LAUNCHERS. AN INVESTIGATION LED BY PRECISION FIRES ROCKET AND MISSILE SYSTEMS (PFRMS) WAS CONDUCTED THROUGH THE REMAINDER OF 2014 AND INTO 2015. THE INVESTIGATION TEAM INCLUDED THE PROTOTYPE INTEGRATION FACILITY (PIF) AND THE HIMARS MANUFACTURER, LOCKHEED MARTIN. THE ROOT CAUSE OF THE CRACKING WAS DETERMINED AND A PIF DESIGN MODIFICATION TO THE PIVOT BOLT IS BEING IMPLEMENTED TO CORRECT THE ISSUE. THE PIF HAS BEEN ASKED TO INSPECT AND RETROFIT THE USMC LAUNCHER FLEET.
Task order obligations
Estimated months remaining until end of performance.
Period of performance
100% of period elapsed
Awarding Agency
DODEPT OF THE ARMY
Code: 2100
Funding Agency
DODEPT OF THE NAVY
Code: 1700
Loading contract activity data...
Modification ID | Description | Action Date | Obligated Amount | Action Type |
|---|---|---|---|---|
Subaward # | Subawardee | Description | Amount | Action Date |
|---|---|---|---|---|