Average obligated amount per year since period start.
Portion of total contract value already obligated.
Share of total value represented by subawards.
IGF::OT::IGF ~~ PREFERRED POWER ARCHITECTURE DEMONSTRATION FOR SOLAR ELECTRIC PROPULSION MODULE - DEVELOP AND DEMONSTRATE A POWER SYSTEM ARCHITECTURE FOR AN IN-SPACE TRANSPORTATION SEP-CENTRIC SPACECRAFT THAT MAXIMIZES THE ELECTRICAL AND THERMAL EFFICIENCIES OF THE POWERTRAIN BETWEEN THE SOLAR ARRAYS AND ELECTRIC PROPULSION THRUSTER TO REDUCE MASS, VOLUME AND COST TO THE SPACECRAFT WHILE ALSO TAKING INTO ACCOUNT THE REQUIREMENTS FOR THE OTHER SPACECRAFT SYSTEMS AND SUBSYSTEMS.
Task order obligations
Estimated months remaining until end of performance.
Period of performance
100% of period elapsed
Awarding Agency
NANATIONAL AERONAUTICS AND SPACE ADMINISTRATION
Code: 8000
Loading contract activity data...
Modification ID | Description | Action Date | Obligated Amount | Action Type |
|---|---|---|---|---|
Subaward # | Subawardee | Description | Amount | Action Date |
|---|---|---|---|---|