THE BASE SCOPE INCLUDES REPLACING THE TWO SECTIONS OF 2.5 INCH PIPING WITH 3.0 INCH PIPING, INSTALLATION OF A FLUE FAN IN EACH OF THE TWO FLUES, AND REPROGRAMMING THE BOILER CONTROLS TO OPERATE IN ACCORDANCE WITH THE MANUFACTURER S SPECIFICATIONS AFTER THE FANS AND PIPING ARE COMPLETED.