THIS MODIFICATION IS ISSUED FOR A SUM OF $15,000.00, TO PREPARE ADDITIONAL CONSTRUCTION DOCUMENTATION AND DRAWING FOR THE PROJECT WORK IN PHASE 3 OF THE EMERGENCY WATERPROOFING PROJECT. THIS CONCLUDES THE LAST 15 DROPS AND STOREFRONT GLASS ON THE LOBBY AND 2ND FLOOR. THE SUM OF $15,000.00 WILL INCREASE THE CONTRACT FROM $333,504.00 TO $348,504.00. ALL TERMS AND CONDITOANS REMAIN THE SAME.