Average obligated amount per year since period start.
Portion of total contract value already obligated.
Share of total value represented by subawards.
IGF::OT::IGF THE CONTRACTOR SHALL PROVIDE ALL OF THE LABOR, MATERIALS,&EQUIPMENT REQUIRED TO MOUNT A 70" TV IN THE HISTORIC COURTROOM OF THE DAVENPORT COURTHOUSE. THE CONTRACTOR IS TO PROVIDE 120V 20A DUAL OUTLET FOR THE MONITOR, ONE ETHERNET CABLE, ONE RGBHV CABLE AND ONE 3 WIRE CABLE ALL TERMINATED IN FLUSH MOUNTED BOXES. THE CONTRACTOR WILL PROVIDE 20' OF EACH CABLE COILED UP IN THE DATA CLOSET WITH 6' COILED UP AT THE DISPLAY. THE US COURTS WILL TERMINATE THE ENDS AS NEEDED. PROVIDE ADDITIONAL PULL STRING IN THE CONDUIT FOR FUTURE NEEDS. GSA HAS SUGGESTED A PATHWAY FOR THE CONDUIT, BUT OTHER OPTIONS WILL BE CONSIDERED.
Task order obligations
Estimated months remaining until end of performance.
Period of performance
100% of period elapsed
Awarding Agency
PBPUBLIC BUILDINGS SERVICE
Code: 4740
Funding Agency
AOADMINISTRATIVE OFFICE OF THE US COURTS
Code: 1027
Loading contract activity data...
Modification ID | Description | Action Date | Obligated Amount | Action Type |
|---|---|---|---|---|
Subaward # | Subawardee | Description | Amount | Action Date |
|---|---|---|---|---|