REMOVE EXISTING EPOXY FLOORING IN THE BAY OF B708 (APPROX. 8646 SQ. FT.), REPAIR DAMAGED CONCRETE, PREPARE SURFACE, APPLY EPOXY COATING WITH ANTI-SLIP TO APPROX. 8646 SQ FT IN ACCORDANCE WITH UFC 4-730-10. (PG. 30) AND PAINT NEW PARKING LINES.
Task order obligations
Estimated months remaining until end of performance.
Period of performance
100% of period elapsed
Awarding Agency
DODEPT OF THE AIR FORCE
Code: 5700
Funding Agency
DODEPT OF THE AIR FORCE
Code: 5700