THE SCOPE OF THE PROJECT IS TO REPAIR AN UNDERMINED CONCRETE FOOTING OF A 23 SPAN X 15.42 RISE X 68 LENGTH BOTTOMLESS LOW PROFILE CULVERT. THE WORK INCLUDES DEWATERING THE CREEK BY CONSTRUCTING A SANDBAG BYPASS DAM AND INSTALLING A BYPASS PIPE, AND C