Average obligated amount per year since period start.
Portion of total contract value already obligated.
Share of total value represented by subawards.
BNSF RR BRIDGE PIER NOSE EXTENSION. USACE SHALL PREPARE THE DESIGN OF THE PIER NOSE EXTENSION TO INCLUDE CIVIL DRAWINGS AND STRUCTURAL DESIGN AND ANALYSIS. THE ARCHITECT-ENGINEER (A-E) IS BEING TASKED WITH PROVIDING GEOTECHNICAL RECOMMENDATIONS AND ANALYSES FOR USACE DESIGN OF PIER NOSE EXTENSION FOUNDATION.
Task order obligations
Estimated months remaining until end of performance.
Period of performance
100% of period elapsed
Awarding Agency
DODEPT OF THE ARMY
Code: 2100
Funding Agency
DODEPT OF THE ARMY
Code: 2100
Loading contract activity data...
Modification ID | Description | Action Date | Obligated Amount | Action Type |
|---|---|---|---|---|
Subaward # | Subawardee | Description | Amount | Action Date |
|---|---|---|---|---|