Average obligated amount per year since period start.
Portion of total contract value already obligated.
Share of total value represented by subawards.
DESIGN BUILD SERVICES HUMANITARIAN ASSISTANCE CONSTRUCTION PROJECT: PREAH ANG DUONG HIGH SCHOOL, CAMBODIA GENERAL INFORMATION: THE CONTRACTOR SHALL PROVIDE ALL PERSONNEL, SERVICES AND SUPPLIES REQUIRED TO PERFORM DESIGN BUILD ENGINEER SERVICES FOR THE CONSTRUCTION OF THE PREAH ANG DUONG HIGH SCHOOL, CAMBODIA. ALL SERVICES ARE TO BE PROVIDED IN ACCORDANCE WITH THE ATTACHED SCOPE OF WORK. PERIOD OF PERFORMANCE: 27 SEPTEMBER 2011- 27 AUGUST 2012 PROGRESS PAYMENTS ARE AUTHORIZED. CONTRACT POC INFORMATION: CONTRACT SPECIALIST: MAJ JUSTIN DE ARMOND AT (907) 753-2548 PROJECT MANAGER: MR. STAN WHARRY AT (907) 753-5781 1.0 BACKGROUND THE OBJECTIVE OF THIS STATEMENT OF WORK (SOW) IS TO DESIGN AND CONSTRUCT A NEW PREAH ANG DUONG HIGH SCHOOL THAT WILL CONSIST OF AN 18-ROOM SCHOOL BUILDING, A 6-STALL MALE BATHROOM, A 10-STALL FEMALE BATHROOM, A WATER SUPPLY, STORAGE, DISTRIBUTION, AND SEPTIC SYSTEM, DEMOLITION AND REMOVAL OF THE EXISTING SCHOOL, ELECTRICAL CONNECTION AND FURNISHINGS, SCHOOL FURNISHINGS AND EQUIPMENT, AND ALL OTHER ASSOCIATED TASKS NECESSARY TO SUPPORT CONSTRUCTION AS DETAILED IN THIS SOW. THE U.S. GOVERNMENT (REFERRED TO HEREAFTER AS THE GOVERNMENT) WILL ACCOMPLISH THIS WORK UTILIZING A DESIGN-BUILD (DB) APPROACH WHERE THE DB CONTRACTOR SHALL BE REQUIRED TO PROVIDE DESIGN ENGINEERING EXPERTISE AND CONSTRUCTION SERVICES NEEDED TO BUILD THE COMPLETE FACILITY AS REQUIRED BY THE SOW. THE GOVERNMENT WILL MONITOR DB EFFORTS USING PERSONNEL FROM THE U.S. GOVERNMENT TEAM. THE TEAM CONSISTS OF PERSONNEL FROM THE U.S. ARMY CORPS OF ENGINEERS (USACE), ALASKA DISTRICT. USACE, ALASKA DISTRICT WILL OBTAIN INDEPENDENT QUALITY ASSURANCE (QA) SUPPORT IN CAMBODIA. THE QA REPRESENTATIVE WILL ATTEND SITE VISITS, PROVIDE TECHNICAL REVIEW OF DESIGN DOCUMENTS, PLANS, SHOP DRAWINGS, AND VENDOR CUT SHEETS. IN ADDITION, THE QA REPRESENTATIVE WILL BE ONSITE TO CONDUCT QUALITY ASSURANCE INSPECTIONS AND MONITOR DESIGN AND CONSTRUCTION PROGRESS. THE DB CONTRACTOR SHALL COORDINATE WITH ALL MEMBERS OF THE GOVERNMENT TEAM TO ENSURE PROJECTS ARE EXECUTED TO A MANNER THAT PROMOTES SAFE PROJECT IMPLEMENTATION AND A QUALITY PRODUCT, IN A TIMELY MANNER, WITHIN SCOPE AND BUDGET.
Estimated months remaining until end of performance.
Task order obligations
Period of performance
100% of period elapsed
Awarding Agency
DODEPT OF THE ARMY
Code: 2100
Funding Agency
DODEPT OF THE ARMY
Code: 2100
Loading contract activity data...
Modification ID | Description | Action Date | Obligated Amount | Action Type |
|---|---|---|---|---|
Subaward # | Subawardee | Description | Amount | Action Date |
|---|---|---|---|---|