IGF::OT::IGF REPAIR WATER BOOSTER PUMP STATION BUILDING 5547 EDWARDS AFB, CA IN ACCORDANCE WITH THE STATEMENT OF WORK DOCUMENT FROM 412 CE/CEOIU FOR PROJECT #09-1280, THE CONTRACTOR SHALL FURNISH ALL LABOR, MATERIALS AND EQUIPMENT NECESSARY TO REPAIR THE WATER BOOSTER PUMP STATION, BUILDING #5547 AT EDWARDS AFB, CA. WORK INCLUDES, BUT IS NOT LIMITED TO, REMOVE/REPLACE 4 STEEL PIPES&FITTINGS, REMOVE/REPLACE ELECTRIC AND GAS WATER BOOSTER PUMPS&DRIVERS, REMOVE/REPLACE VALVES, WATER METERS, REMOVE/REPLACE ELECTRICAL PANELS&INSTALL NEW BREAKER PANELS, REPLACE ELECTRICAL CONNECTORS, CONTROLLERS, SWITCHES, INSTALL MANUAL TRANSFER SWITCHES TO ALLOW ELECTRICAL TO OPERATE WITH GENERATOR POWER, PROVIDE NEW ELECTRIC HEATER&THERMOSTAT. LIQUIDATED DAMAGES ARE $1,350.00 PER DAY.
Task order obligations
Estimated months remaining until end of performance.
Period of performance
100% of period elapsed
Awarding Agency
DODEPT OF THE ARMY
Code: 2100
Funding Agency
DODEPT OF THE ARMY
Code: 2100
Loading contract activity data...
Modification ID | Description | Action Date | Obligated Amount | Action Type |
|---|---|---|---|---|
Subaward # | Subawardee | Description | Amount | Action Date |
|---|---|---|---|---|